Estimate For Interconnection Work Of 11 Kv Dagawaneema To 11 Kv Abgaon Khurd Feeder Under Sstd Scheme Under Harda North Dc Under Oand M Harda North Division.
|
Description |
Estimate For Interconnection Work Of 11 Kv Dagawaneema To 11 Kv Abgaon Khurd Feeder Under Sstd Scheme Under Harda North Dc Under Oand M Harda North Division.
|
Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
Tender Id | 2025_MKVVC_415116_1 |
Reference Number |
DGM/STM-STC/HD/2025-26/NIT-03 Date-07.04.25 |
Tender Fee | 1475 |
EMD | 15600 |
Tender Value | |
Place | DGM STM and STC MPMKVVCL HARDA |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=489548 |
Start Date | April 07, 2025 23:35 |
End Date |
21/04/2025 ( Expired 1 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engagement of carrying contractor for carrying of drugs dressings and other articles from esi central medical stores to different esi institutions under esi mb scheme wb
Engagement of carrying contractor for carrying of drugs dressings and other articles from esi central medical stores to different esi institutions under esi mb scheme wb
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreSs of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Ss of stone aggregate 40 mm comma 20 mm comma 10 mm and coarse river sand for constr of pmt work bet km 0 pt 00 to km 22 pt 500 0 pt 00 considered at sumdo on sumdo murmi dogri rd under 108 rcc 759 brtf of project deepak in hp state
Read moreWbpwd/pw(r)/se/shc/nit no 02 of 2025-2026(2nd-call)
Herobhanga vidyasagar vidyamandir to jharkhali ferry ghat road, from 0.00 kmp to 3.80 kmp, widening and strengthening work under south 24-parganas highway division, p.w (roads) directorate in the district of south 24-parganas.
Read moreRfp for selection of firm to carry out energy audit/energy bill audit service and electrification work in compliance of energy audit report for street lights, water pumping stations, stp, office buildings, sulabh complex under rmc area.
Rfp for selection of firm to carry out energy audit/energy bill audit service and electrification work in compliance of energy audit report for street lights, water pumping stations, stp, office buildings, sulabh complex under rmc area.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreAAAAAAAAAA
Login to viewSitaramdas omkarnath sarani (p.w.d. raod) from 0.00 km to 0.480 km strengthening under kolkata north division, p.w.d. in the district of north 24 parganas (dunlop bound carriageway only).
Read moreAAAAAAAAAA
Login to viewGhospara road from 2.00 km to 9.00 km and 17.50 km to 21.00 km- strengthening work under barrackpore division, p.w.d. in the district of north 24 parganas. during the year 2024-25..2nd call
Read moreAAAAAAAAAA
Login to viewBarrackpur-barasat (sh-1) road from 0.406 km to 1.991 km, widening works including rcc box drain under barrackpur division in the district of north 24 parganas.. 2nd call
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreof your Industry type