Tender Details

About Tender

🛣️ Invitation For Bids: Widening Of Rub Bridge No. 1, Gaya Bridge 🌉 Rcd Ein C, On Behalf Of The State Government And Union Territories, Invites Bids For The Widening And Existing Rail Under Bridge (Rub) Bridge No. 1, Gaya Bridge, Located At Km 12.00 Of Nh 32 In Dhanbad. This Project Is Funded Under The Deendayal Antyodaya Yojana National Rural Livelihoods Mission (Day Nrlm) For The Financial Year 2023 24. 📅 Bid Submission Deadline: April 05, 2024, 12:00 Pm Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 24,93,000 Interested Bidders Must Possess The Necessary Qualifications And Experience To Undertake Such Infrastructure Projects. Bids Should Include Detailed Project Plans, Cost Estimates, And Timelines For Completion, Adhering To The Specifications Outlined In The Tender Documents. Keywords: Infrastructure, Rub Bridge, Gaya Bridge, Widening Project, Dhanbad, Dmft Fund, Rcd Ein C, Day Nrlm, Bid Submission, Tender, Emd
Particulars Details
Title
Widening And Existing Rub (Rail Under Bridge) Bridge No. 1, Gaya Bridge Of Railway At Km 12.00 Of Nh 32 In Dhanbad Under Dmft Fund For The Year Of 2023 24
Description
Widening And Existing Rub (Rail Under Bridge) Bridge No. 1, Gaya Bridge Of Railway At Km 12.00 Of Nh 32 In Dhanbad Under Dmft Fund For The Year Of 2023 24
Organisation RCD EinC | State Govt. and UT
Tender Id 2024_CECOM_85548_1
Reference
Number
RCD /DHANBAD/160/2023-24
Tender Fee 10000
EMD 24.93 Lakh
Tender Value
Place Dhanbad
Link https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=114731
Start Date March 13, 2024 18:00
End Date

05/04/2024 ( Expired 446 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Ie services during onm period for four laning of nh-365a from kodad (design km 0.00/ existing km.185.00 of nh-65) to khammam (design km.31.800/ existing km.29.400) (design length 31.800 km) in the state of telangana under bharatmala pariyojana on ham

Read more
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode

Read more
Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Construction of foot over bridge (fob) near holy shrine, bambolim at km 524.330 on nh-66 in the state of goa on epc mode under road safety annual plan 2023-24.

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise