Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pr Of Handed Over Pmgsy Road From Sonamura Boxanagar Road To Madhyapara (Link No. 056) (L 0.742 Km)/
|
| Description |
Patch Soling, Patch Metalling, Re Carpeting, Road Side Drain And Other Allied Works Under Pwd (R And B) Boxanagar Sub Division During The Year 2023 24 Under Sjtny.
|
| Organisation | Government of Tripura |
| Tender Id | 2023_CEPWD_42442_1 |
|
Reference Number |
51/R/DNIeT/SE-IV/PWD(R AND B)/2023-24. |
| Tender Fee | 1000 |
| EMD | 81551 |
| Tender Value | - |
| Place | SONAMURA |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in |
| Start Date | September 27, 2023 23:25 |
| End Date |
Expired
10/10/2023
Expired 1101 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.251 km to ch. 0.416 km
Development of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.251 km to ch. 0.416 km
Read moreDevelopment of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km
Development of road from sonamura-boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain gsb wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.166 km
Read moreDevelopment of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain rcc retaining wall wbm 3 paver block and other allied works portion from ch. 0.166 km to ch. 0.251 km
Development of road from sonamura boxanagar to sonamura boxanagar road (dayalpara) (l-0.416 km) sh pucca drain rcc retaining wall wbm 3 paver block and other allied works portion from ch. 0.166 km to ch. 0.251 km
Read moreConstruction of w b m approach road to slaughter house plot handed over by cidco in nerul navi mumbai
Construction of w b m approach road to slaughter house plot handed over by cidco in nerul navi mumbai
Read moreInstallation of 01 (one) solar mini rli (handed over) scheme at haripal mouza under sankrail block under midnapore (a-m) division under core-sector program
Installation of haripal new handed over solar mini rli (new handed over) scheme at mouza haripal in sankrail block of jhargram district under midnapore (am) division under core sector program.
Read moreTo procure, transport, supply, loading, unloading, installation, commissioning, training, trail run, including civil engineering ,electrification to provide license to be handed over to custodian chief depot superintendent, signal stores depot, podanur
To procure, transport, supply, loading, unloading, installation, commissioning, training, trail run, including civil engineering ,electrification to provide license to be handed over to custodian chief depot superintendent, signal stores depot, podanur
Read moreConstrurction of submercibal bridge over gaghar river on link road from 1 a to 61 gb
Construrction of submercibal bridge over gaghar river on link road from 1 a to 61 gb
Read moreConstruction of link road from pmgsy manyal dara road to mohalla upper dara pyt lower manyal under district plan 2nd call
Construction of link road from pmgsy manyal dara road to mohalla upper dara pyt lower manyal under district plan 2nd call
Read moreSpecial repair/emergent repair work for the left out portion of nh-120 (dumraon bazar) from ch. 240.200 to ch. 245.400 (excluding portion of 940m handed over to bsrdcl) for the year 2026-27.
Special repair/emergent repair work for the left out portion of nh-120 (dumraon bazar) from ch. 240.200 to ch. 245.400 (excluding portion of 940m handed over to bsrdcl) for the year 2026-27.
Read moreOver head wire rope suspension assy consisting of 6 mm galvanised wire rope‘ d’ link rope clamp
Over head wire rope suspension assy consisting of 6 mm galvanised wire rope‘ d’ link rope clamp
Read moreof your Industry type