Tender Details
Particulars | Details |
---|---|
Title |
State Plan 2024 25 Iwss To Irinjalakuda Muncipality Supplying And Fitting 350mm Butterfly Valve For High Level Zone Main Valve
|
Description |
State Plan 2024 25 Iwss To&Amp#X0d
Irinjalakuda Muncipality &Amp#X0d
Supplying And Fitting 350mm&Amp#X0d
Butterfly Valve For High Level&Amp#X0d
Zone Main Valve&Amp#X0d
|
Organisation | Kerala Water Authority | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 555 |
EMD | 5554 |
Tender Value | |
Place | Irinjalakkuda |
Link |
AAAAAAAAAA Login to view |
Start Date | June 05, 2025 21:30 |
End Date |
11/06/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.
Read morePetty repair and day to day maintenance of sanitary fitting, tilling, cp fittings, plumbing, plastering and certain b/r work for jcos/ors md accn of zone 7a at naa under ge (n) tezpur
Petty repair and day to day maintenance of sanitary fitting, tilling, cp fittings, plumbing, plastering and certain b/r work for jcos/ors md accn of zone 7a at naa under ge (n) tezpur
Read moreAAAAAAAAAA
Login to viewOperation and maintenance of distribution system including rising main and fhtc for satyadaspur and sitarampur piped water supply scheme of pathar pratima block under kakdwip sub division of alipore division, phe dte. (from 01.07.2025 to 30.06.2026)
Read moreComprehensive amc (annual maintenance contract) including operations for real time sensing and monitoring of water level and discharge of banbasa barrage, sarda sagar reservoir and sarda main canal from km. 0.00 to km. 45.00
Comprehensive amc (annual maintenance contract) including operations for real time sensing and monitoring of water level and discharge of banbasa barrage, sarda sagar reservoir and sarda main canal from km. 0.00 to km. 45.00
Read moreAAAAAAAAAA
Login to viewOperation and maintenance of distribution system including rising main and fhtc for kamalpur rudranagar zone-i piped water supply scheme of sagar block under kakdwip sub division of alipore division, phe dte. (period from 01.07.2025 to 30.06.2026)
Read moreAAAAAAAAAA
Login to viewOperation and maintenance of distribution system , rising main, sluice valves, including operation of sluice valves of mera pwss within katwa sub-division under burdwan division, phe dte. period for 01.07.2025 to 30.06.2026.
Read moreAAAAAAAAAA
Login to viewOperation and maintenance of distribution system , rising main, sluice valves, including operation of sluice valves of charkhi pwss within katwa sub-division under burdwan division, phe dte. period for 01.07.2025 to 30.06.2026
Read moreMla sdf ads wss to chakrapanithadam supplying and erecting the submersible pump sets with fabrication works at intake pump house and supplying, laying distribution main from tank for ward no 2 and 4pazhavangadi grama panchaythu general civil work
Mla sdf ads wss to chakrapanithadam supplying and erecting the submersible pump sets with fabrication works at intake pump house and supplying, laying distribution main from tank for ward no 2 and 4pazhavangadi grama panchaythu general civil work
Read moreMaintenance , repairs, supply, delivery and erection of submerisible pump and hdpe pipe line, repairs works at various locations in circle-11, rajendranagar, charminar zone, ubd ghmc for the year 2024-25 during the period of 18.12.2024 to 30.01.2025 during the year 2024-25
Maintenance , repairs, supply, delivery and erection of submerisible pump and hdpe pipe line, repairs works at various locations in circle-11, rajendranagar, charminar zone, ubd ghmc for the year 2024-25 during the period of 18.12.2024 to 30.01.2025 during the year 2024-25
Read moreAAAAAAAAAA
Login to viewOperation and maintenance of distribution system , rising main, sluice valves, including operation of sluice valves of ekaihat pwss within katwa sub-division under burdwan division, phe dte period for 01.07.2025 to 30.06.2026
Read moreof your Industry type