Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Replacement Of External Gi Water Supply Line For L 38 To M 2 Quarters At Permanent Campus, Nehu, Shillong
|
Description |
Replacement Of External Gi Water Supply Line For L 38 To M 2 Quarters At Permanent Campus, Nehu, Shillong
|
Organisation | North-Eastern Hill University (NEHU) | Central Govt. Ministry/Department |
Tender Id | 2024_NEHU_838695_1 |
Reference Number |
CS/ESTM/4493/2024-304 dt-06/12/2024 |
Tender Fee | 500 |
EMD | 8500 |
Tender Value | |
Place | NEHU,Shillong |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=881533 |
Start Date | December 10, 2024 15:30 |
End Date |
17/12/2024 ( Expired 202 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreConsultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Consultancy services for preparation of dpr for i. widening to 2l ps of balance reaches km 184.840 to km 190.00 and km 194.840 to 198.800, ii. construction of additional vent to existing major bridge at km 210.0 to 2 of nizamabad to jagdalpur nh 63
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreComp maint of control panels, drivers, gear trolly, chain pully block and allied wks alongwith repair /replacement to doors, windows, flooring and related b/r wks at various e/m installations at common area and nad area under age b/r-ii at ns karanja
Comp maint of control panels, drivers, gear trolly, chain pully block and allied wks alongwith repair /replacement to doors, windows, flooring and related b/r wks at various e/m installations at common area and nad area under age b/r-ii at ns karanja
Read more87717 augmentation of water supply works at ins rajali arakkonam under ge(m) arakkonam
87717 augmentation of water supply works at ins rajali arakkonam under ge(m) arakkonam
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreProviding and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Providing and laying di pipeline from source no. iii to water treatment plant at sabari - 8000 mtr. sw - consultancy services for conducting eia study and obtaining of forest clearance.
Read moreSplrepair to taxi track between bldg no p-21 22 r o flt hangar p48, kote of 671 army avn sqn r o and spl repair to epoxy coating and water supply pipe line of bldg no t06a t5a utility hanars of 204 army avn sqn at dinjan under ge dinjan
Splrepair to taxi track between bldg no p-21 22 r o flt hangar p48, kote of 671 army avn sqn r o and spl repair to epoxy coating and water supply pipe line of bldg no t06a t5a utility hanars of 204 army avn sqn at dinjan under ge dinjan
Read moreof your Industry type