Tender Details
Particulars | Details |
---|---|
Title |
Electrification Work For 11 Kv Line And 11/0.4 Kv Substation In Udyog Vihar Phase I.
|
Description |
Electrification Work For 11 Kv Line And 11/0.4 Kv Substation In Udyog Vihar Phase I.
|
Organisation | Jodhpur Development Authority | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 4000 |
EMD | 6.55 Lakh |
Tender Value | |
Place | jda jodhpur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 19, 2025 18:30 |
End Date |
09/06/2025 ( 20 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreDpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh
Dpr for construction of grade separators at sarona chowk (ch. 279.750) udyog bhawan (269.000) telibandha chowk (ch. 268.000) on raipur city portion of nh53 at raipur aurang section and ape(10.700) chowk of nh-30 raipur kodebad in chhattisgarh
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read morePkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreSkilled manpower for working on s and t systems for line 2b, 7a, 9 and depot.
Provision of skilled manpower for working on s and t, psd and afc system provided in mumbai metro line 2b, mandale depot, line 9 and line 7a (phase-i) for an initial period of two years
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreReplacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh stps ckt 1st and ckt 2nd at suspension towers
Replacement work of existing porcelain disc insulator strings by silicon rubber housed composite insulator (120 kn suspension type) for 400 kv s/c ratangarh-stps ckt 1st and ckt 2nd at suspension towers
Read moreof your Industry type