Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Renewal Work From Bc On Akbarpur Chanda Patti Delhupur Road (State Highway No. 128) Total 29.105 Km (1)
|
| Description |
Renewal Work From Bc On Akbarpur Chanda Patti Delhupur Road (State Highway No. 128) Total 29.105 Km (1)
|
| Organisation | Cheif Engineer Allahabad Zone PWD Allahabad | State Govt. and UT |
| Tender Id | 2024_CEALD_914638_1 |
|
Reference Number |
785/93C/etendering/P.F.C/2024 Dt 08.02.2024 |
| Tender Fee | 2714 |
| EMD | 16.75 Lakh |
| Tender Value | - |
| Place | pratapgarh |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1580695 |
| Start Date | March 09, 2024 14:30 |
| End Date |
Expired
14/03/2024
Expired 946 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Road safety work on akbarpur chanda patti delhupur road nh 128
Road safety work on akbarpur chanda patti delhupur road nh 128
Read moreB.t. renewal work on rau-mhow-mandleshwar road (total length-25 km.)
B.t. renewal work on rau-mhow-mandleshwar road (total length-25 km.)
Read moreB.t. renewal work at khandwa-dedtalai-burahanpur road in (total length 43 km.)
B.t. renewal work at khandwa-dedtalai-burahanpur road in (total length 43 km.)
Read moreAssociate signalling works in connection with bg through turnout renewal (without sleepers) (total-137 sets) in ghy- lmg and bg through turnout renewal (with sleepers) (total- 32 sets) in lmg- jmi section (grand total- 169 sets) under the jurisdiction of sr.den/i/lmg.
Associate signalling works in connection with bg through turnout renewal (without sleepers) (total-137 sets) in ghy- lmg and bg through turnout renewal (with sleepers) (total- 32 sets) in lmg- jmi section (grand total- 169 sets) under the jurisdiction of sr.den/i/lmg.
Read moreComplete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Complete track renewal (p) 60 kg = 31.475 tkm and through sleeper renewal(p)=11.444 tkm. total=43.019 tkm by using any track laying equipment (tle) in sdah division of eastern railway
Read moreStandardisation of turnouts (total 200 nos.) - sleeper spacing, casual sleeper and fittings renewal, plate screw renewal, casual rail renewal for gapless crossing, deep screening, tamping and other miscellaneous works in the jurisdiction of assistant engineer/ballygunge under divisional engineer/hq/sealdah.
Standardisation of turnouts (total 200 nos.) - sleeper spacing, casual sleeper and fittings renewal, plate screw renewal, casual rail renewal for gapless crossing, deep screening, tamping and other miscellaneous works in the jurisdiction of assistant engineer/ballygunge under divisional engineer/hq/sealdah.
Read moreB.t. renewal work of kirangi to narmada river approach road length 1.20 km. and harratola to narmada river approach road length 1.60 km. total length 3.90 km. (1st call)
B.t. renewal work of kirangi to narmada river approach road length 1.20 km. and harratola to narmada river approach road length 1.60 km. total length 3.90 km. (1st call)
Read more(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
(i) through rail renewal (primary) {trr(p)} for 37.353 tkm in rksn-pdph & pdph-nyg section & (ii) through turnout renewal {ttr(tws)} for total 269 sets in different yards of rksn-pdph, pdph-nyg, pdph-byx & bjmd-gx section under the jurisdiction of sr. den (south)/ckp.
Read moreRehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
Rehabilitation and upgradation of existing 4l highway to a 6l divided carriageway of orai barah section of nh27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
Read moreB.t. renewal work of mohani to silthar road length 2.20 km , vikrampur kanya ashran approach road langth 1.80 km and dalka bandha to bilgada road langth 1.18 km total length 5.18 km (1st call)
B.t. renewal work of mohani to silthar road length 2.20 km , vikrampur kanya ashran approach road langth 1.80 km and dalka bandha to bilgada road langth 1.18 km total length 5.18 km (1st call)
Read moreof your Industry type