Tender Details

Particulars Details
Title
Expression Of Interest For Shortlisting Of Sub Contractor For Supply, Erection , Testing And Commissioining Of Blast Furnace Gas Fired Boilers, Back Pressure Turbine Generator And Steam Turbine Driven Turbo Blowers Along With Associated Auxiliaries
Description
Expression Of Interest For Shortlisting Of Sub Contractor For Supply, Erection , Testing And Commissioining Of Blast Furnace Gas Fired Boilers, Back Pressure Turbine Generator And Steam Turbine Driven Turbo Blowers Along With Associated Auxiliaries
Organisation MECON LIMITED | Public Sector Undertakings
Tender Id 2025_MECON_228182_1
Reference
Number
11.MG.RKG.PBS. dated 24.02.2025
Tender Fee 0
EMD 0
Tender Value
Place SAIL DURGAPUR
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=256368
Start Date February 27, 2025 23:30
End Date

12/03/2025 ( Expired 67 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Expression of interest (eoi) for major repair of multi louver dampers and replacement of associated exhaust ducting, expansion joints and blind plate along with insulation of gas turbine exhaust system

Expression of interest (eoi) for major repair of multi louver dampers and replacement of associated exhaust ducting, expansion joints and blind plate along with insulation of gas turbine exhaust system

Read more
Ktps vii stage/paloncha - supply,erection,testing and commissioning of refrigeration type hydrogen gas drier(stainless steel) for turbo generator

Tggenco-ktps vii stage/paloncha - supply, erection, testing and commissioning of refrigeration type hydrogen gas drier(stainless steel) for turbo generator.

Read more
Expression of interest for shortlisting of sub contractor for supply, erection , testing and commissioining of blast furnace gas fired boilers, back pressure turbine generator and steam turbine driven turbo blowers along with associated auxiliaries

Expression of interest for shortlisting of sub contractor for supply, erection , testing and commissioining of blast furnace gas fired boilers, back pressure turbine generator and steam turbine driven turbo blowers along with associated auxiliaries

Read more
Design, manufacture, supply, erection, testing n commissioning and handing over of archimedes screw turbine (2x38 kw) along with associated equipments at dam site for utilizing e-flow and 1x150 kw at power house utilizing water of trt of unit # 3 in

Design, manufacture, supply, erection, testing n commissioning and handing over of archimedes screw turbine (2x38 kw) along with associated equipments at dam site for utilizing e-flow and 1x150 kw at power house utilizing water of trt of unit # 3 in

Read more
Ktps vii stage/paloncha - supply,erection,testing and commissioning of refrigeration type hydrogen gas drier(stainless steel) for turbo generator

Tggenco-ktps vii stage/paloncha - supply,erection,testing and commissioning of refrigeration type hydrogen gas drier(stainless steel) for turbo generator

Read more
Modification works for con of steam turbine generator (stg) (121tg1) to back pressure turbine at cpcl manali

Modification works for con of steam turbine generator (stg) (121tg1) to back pressure turbine at cpcl manali

Read more
Design, engineering, manufacturing, supply, inspection, testing, transportation, fabrication and site works, erection, commissioning and pgtr of back pressure turbine assembly package for stg 3 at mathura refinery on lstk basis including mechanical,

Design, engineering, manufacturing, supply, inspection, testing, transportation, fabrication and site works, erection, commissioning and pgtr of back pressure turbine assembly package for stg 3 at mathura refinery on lstk basis including mechanical,

Read more
Work proposal for work contract for helium leak detection testing of main turbine steam condenser and related negative pressure parts/ equipments/ auxiliaries installed in turbine area in unit-1 and 2 at 2x600 mw, sstpp, mppgcl, dongalia.

Work proposal for work contract for helium leak detection testing of main turbine steam condenser and related negative pressure parts/ equipments/ auxiliaries installed in turbine area in unit-1 and 2 at 2x600 mw, sstpp, mppgcl, dongalia.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise