Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Es Instn I Removal Cleaning Calibration And Re Fixing Of Level Switches Bth S And Other Instruments For Annual Overhaul 2024 2025 In Unit Iii Turbine Area
|
| Description |
Ttps Es Instn I Removal Cleaning Calibration And Re Fixing Of Level Switches Bth S And Other Instruments For Annual Overhaul 2024 2025 In Unit Iii Turbine Area
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_463500_1 |
|
Reference Number |
CE/SE/ES /TTPS /No.229/2024-25 |
| Tender Fee | 0 |
| EMD | 700 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550846 |
| Start Date | July 16, 2024 23:30 |
| End Date |
Expired
31/07/2024
Expired 805 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit v capital overhaul 2026 2027
Ttps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit v capital overhaul 2026 2027
Read moreTtps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit iv capital overhaul 2026 2027
Ttps es circle instn ii removing cleaning and assisting for calibration of all field instruments in pneumatic lab and other related works during unit iv capital overhaul 2026 2027
Read moreTtps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit v for the year 2026 2027
Ttps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit v for the year 2026 2027
Read moreTtps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit iv for the year 2026 2027
Ttps es circle instn ii removal cleaning and refixing of instruments pertaining to east hp bypass system stator water and seal oil system during capital annual overhaul of unit iv for the year 2026 2027
Read moreTtps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Ttps es circle instn ii removing cleaning flushing, and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas, disconnection and reconnection of power and control cables of actuators limit switches feedback
Read moreTtps es circle instn ii unit v removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedb
Ttps es circle instn ii unit v removing cleaning flushing and refixing of bearing temperature heat gauges critical transmitters in boiler and turbine areas disconnection and reconnection of power and control cables of actuators limit switches feedb
Read moreTtps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit v
Ttps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit v
Read moreTtps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit iv
Ttps es circle instn ii overhaul of sample coolers and other related works and painting of wet panels and replacement of 6 nos worn out half ss globe valves during the annual overhaul for the year 2026 27 in unit iv
Read moreTtps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt
Ttps es circle instn ii overhauling of 48 nos sadc cylinder positioners and air lock relays 78 nos of instruments pertaining to sadc heavy oil prds and soot blower systems 4 nos burner tilt cylinders 14 nos of instruments pertaining to burner tilt
Read moreTtps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Ttps mechii tm i unitiii overhauling of steam and condensate valves of turbine regeneration system during the forthcoming annual overhaul
Read moreof your Industry type