Tender Details
Particulars | Details |
---|---|
Title |
Sitc Of Split Air Conditioners Two Ton With Five Star,Sitc Of Split Air Conditioners One And Half T
|
Description |
|
Organisation | Department of Defence Research & Development | Ministry of Defence |
Tender Id | GEM/2025/B/6135291 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | April 12, 2025 00:32 |
End Date |
02/05/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, manning, operation and maintenance of one(01) number security launch with steel/frp/aluminium hull on hire basis having speed of 20knots for a period ten of years
Supply, manning, operation and maintenance of one(01) number security launch with steel/frp/aluminium hull on hire basis having speed of 20knots for a period ten of years
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreJp/b862-201-pg-t-7490/1015 - steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Steam generation system package for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreSitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Sitc and operation and maintenance of advanced traffic management system (atms) on national highway 92, 730b, 730c, and 731k from etawah to pilibhit (length 240.726 km.)in the state of up (gnhcp) with loan assistance of world bank on epc mode
Read moreSupply of one number fire vehicle with ss water
Detail of chassis -ashok leyland 1920 hf or equivalent tata model etc.&#x0d &#x0d 18 ton minimum or above bs-vi cowl chassis power steering model ex showroom (b) body building details design fabrication and supply of combined foam co2 crash tender
Read moreUpgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 bagasara to thangalol section of nh351 in the state of gujarat package iv on epc mode
Read moreEoi for sitc of integrated air traffic simulator (iats) for air traffic services of new delhi, kolkata, mumbai and chennai airport
Eoi for sitc of integrated air traffic simulator (iats) for air traffic services of new delhi, kolkata, mumbai and chennai airport
Read moreHeavy duty hydraulic open die forging press of capacity 3000 ton integrated with two rail bound manipulators
Heavy duty hydraulic open die forging press of capacity 3000 ton integrated with two rail bound manipulators
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreRehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Rehabilitation and up-gradation to two lane with paved shoulder configuration from km 67.100 to 67.885, km 76.100 to 77.060, km 80.450 to 81.520, km 82.000 to 82.230, km 82.400 to 82.610 and km 96.840 to 98.095 on balance length of 4.51 km long katol
Read moreof your Industry type