Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication And Erection Of Pit Bottom Gate In Pit No 2 Of Vk Unit And At Pit No 3 And No 1 Nkj Unit In Khandra Colliery
|
| Description |
Fabrication And Erection Of Pit Bottom Gate In Pit No 2 Of Vk Unit And At Pit No 3 And No 1 Nkj Unit In Khandra Colliery
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_300611_1 |
|
Reference Number |
ECL/GM/BA/E TENDER/23-24/EnM/299 Dt. 06.02.2024 |
| Tender Fee | 0 |
| EMD | 2600 |
| Tender Value | - |
| Place | Khandra Colliery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311380 |
| Start Date | February 06, 2024 23:30 |
| End Date |
Expired
16/02/2024
Expired 970 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreConstruction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery
Construction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery
Read moreConstruction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery
Construction of protective roof at no 2 and 3 pit at e.s.p unit of shyamsundarpur colliery (retender).
Read moreRepairing of earth pit at nkj unit khandra colliery
Repairing of earth pit at nkj unit khandra colliery
Read moreRepairing of earth pit at vk unit khandra colliery
Repairing of earth pit at vk unit khandra colliery
Read moreConstruction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery (retender).
Construction of protective roofing at pit bottom of no 1 and 2 pit at vk unit and no 1 and 3 pit at nkj unit of khandra colliery (retender).
Read moreComprehensive service building maintenance works of different places at nkj, vk unit and moira colliery under khandra colliery
Comprehensive service building maintenance works of different places at nkj, vk unit and moira colliery under khandra colliery
Read moreIllumination at different location of underground of khandra colliery (nkj unit and vk ) under bankola area
Illumination at different location of underground of khandra colliery (nkj unit and vk ) under bankola area
Read moreof your Industry type