Tender Details

Particulars Details
Title
Dismantling, Shifting N Drawing Of 11 Kv Overhead Line From Kalimandir Sub Station To Phase Iv Pumping Sub Station At Nsocp Under Kunustoria Area.
Description
Dismantling, Shifting N Drawing Of 11 Kv Overhead Line From Kalimandir Sub Station To Phase Iv Pumping Sub Station At Nsocp Under Kunustoria Area.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_329582_1
Reference
Number
ECL/KNT/EnM)e-Ten/24-25/22 18.02.2025
Tender Fee 0
EMD 20400
Tender Value -
Place North searsole ocp
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=341617

Start Date February 22, 2025 22:30
End Date
Expired 04/03/2025

Expired 587 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling, shifting n di of existing 11kv overhead line from kantagoria substation near phase-iv at nsocp (departmental) under kunustoria area

Dismantling, shifting n di of existing 11kv overhead line from kantagoria substation near phase-iv at nsocp (departmental) under kunustoria area

Read more
Shifting and erection of 440v n 550v overhead line from kantagoria to proposed pumping site of nsocp (ph-iv) under kunustoria area.

Shifting and erection of 440v n 550v overhead line from kantagoria to proposed pumping site of nsocp (ph-iv) under kunustoria area.

Read more
Dismantling, shifting n drawing of 11kv oh line from 4 no substation to pumping substation phase-iii under kunustoria area.

Dismantling, shifting n drawing of 11kv oh line from 4 no substation to pumping&#x0d substation phase-iii under kunustoria area.&#x0d

Read more
Installation and erection of 11kv overhead line from ss no 4 to new proposed ss at kantagoria for dewartering of phase iv of nsocp under kunustoria area.

Installation and erection of 11kv overhead line from ss no 4 to new proposed ss at kantagoria for dewartering of phase iv of nsocp under kunustoria area.

Read more
Installation and erection of 11kv overhead line from s/s no-4 to new proposed s/s at kantagoria for dewartering of phase-iv of nsocp under kunustoria area.

Installation and erection of 11kv overhead line from s/s no-4 to new proposed s/s at kantagoria for dewartering of phase-iv of nsocp under kunustoria area.

Read more
Arrangement for drainage of stormwater through hume pipes in nsocp (phase-iv) under kunustoria area.

Arrangement for drainage of stormwater through hume pipes in nsocp (phase-iv) under kunustoria area.

Read more
Day to day shifting, dismantling and drawing of 6.6kv overhead line

Day to day shifting, dismantling and drawing of 6.6kv overhead line for feeder no. 05 and feeder no. 04 from substation no. 01(old)/ substation no. 03 to mines to enable the expansion of mines for power supply of hemm of kocp for a period of 360 days

Read more
Installation of ngr in 1mva 600 kva, 11kv 3.3kv power transformer installed at nsocp under kunustoria area

Installation of ngr in 1mva 600 kva, 11kv 3.3kv power transformer installed at nsocp under kunustoria area

Read more
Installation of ngr in 1mva n 600 kva, 11kv/3.3kv power transformer installed at nsocp under kunustoria area

Installation of ngr in 1mva n 600 kva, 11kv/3.3kv power transformer installed at nsocp under kunustoria area

Read more
Day to day shifting, dismantling and drawing repositioning of 6.6 kv / 3.3kv overhead line

Day to day shifting, dismantling and drawing repositioning of 6.6 kv / 3.3kv overhead line for power supply of godavari patch and narayani face of kocp for a period of 240 days.

Read more
Click Here to Download Dockets