Tender Details

Particulars Details
Title
Major Repair Of Pedestal And Replacement Of Existing Elastomeric Bearing Of 4.96 Km Elevated Viaduct For Navi Mumbai Metro Project Between Ch. 170 M To Ch. 5130 M On Belapur Taloja Khandeshwar Corridor Of Navi Mumbai Metro Line 1
Description
Major Repair Of Pedestal And Replacement Of Existing Elastomeric Bearing Of 4.96 Km Elevated Viaduct For Navi Mumbai Metro Project Between Ch. 170 M To Ch. 5130 M On Belapur Taloja Khandeshwar Corridor Of Navi Mumbai Metro Line 1
Organisation Maharashtra Metro Rail Corporation Limited | Public Sector Undertakings
Tender Id 2024_MMRCL_1092090_1
Reference
Number
NM1-C-23/2024
Tender Fee 35400
EMD 8.77 Lakh
Tender Value
Place METRO BHAVAN VIP ROAD NEAR DIKSHABHOOMI RAMDASPETH NAGPUR
Link www.metrorailnagpur.com https://mahatenders.gov.in.
Start Date October 11, 2024 16:30
End Date

21/10/2024 ( Expired 182 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Replacement of elastomeric bearings on viaduct from shahdara to dilshad garden metro stations and expansion joint replacement at jhilmil and dilshad garden metro station of line-1.

Replacement of elastomeric bearings on viaduct from shahdara to dilshad garden metro stations and expansion joint replacement at jhilmil and dilshad garden metro station of line-1.

Read more
Viaduct inspection, bearing inspection, repair/replacement of bearing/pedestals, rain water drainage work over piers and repair/maintenance of rain water harvesting system and other miscellaneous works between ccs airport to munshipulia metro station

Viaduct inspection, bearing inspection, repair/replacement of bearing/pedestals, rain water drainage work over piers and repair/maintenance of rain water harvesting system and other miscellaneous works between ccs airport to munshipulia metro station

Read more
Major repair of pedestal and replacement of existing elastomeric bearing of 4.96 km elevated viaduct for navi mumbai metro project between ch. 170m to ch. 5130m on belapur-taloja-khandeshwar corridor of navi mumbai metro line-1

Major repair of pedestal and replacement of existing elastomeric bearing of 4.96 km elevated viaduct for navi mumbai metro project between ch. 170m to ch. 5130m on belapur-taloja-khandeshwar corridor of navi mumbai metro line-1

Read more
Tender for licensing of spaces to operate banking retail outlet/s by installation of 12 atms at belapur , kharghar village, central park, pethpada, pethali taloja and pendhar metro stations of navi mumbai metro line-1.

Tender for licensing of spaces to operate banking retail outlet/s by installation of 12 atms at belapur , kharghar village, central park, pethpada, pethali taloja and pendhar metro stations of navi mumbai metro line-1.

Read more
Viaduct inspection, bearing inspection, repair/replacement of bearing/pedestals, rain water drainage work over piers and repair/maintenance of rain water harvesting system and other miscellaneous works between ccs airport to munshipulia metro station

Viaduct inspection, bearing inspection, repair/replacement of bearing/pedestals, rain water drainage work over piers and repair/maintenance of rain water harvesting system and other miscellaneous works between ccs airport to munshipulia metro station

Read more
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) system for upgradation of existing navi mumbai metro line-1 network including back office. (on behalf of cidco)

Design, manufacture, supply, installation, testing and commissioning of automatic fare collection (afc) system for upgradation of existing navi mumbai metro line-1 network including back office. (on behalf of cidco)

Read more
Up-gradation of existing 6 lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of nh 47 (narol junction to sarkhej junction) in the state of gujrat on hybrid annuity mode.

Up-gradation of existing 6 lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of nh 47 (narol junction to sarkhej junction) in the state of gujrat on hybrid annuity mode.

Read more
Construction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o

Construction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o

Read more
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise