Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Independent Safety Assessment Services For Signalling, Train Control Systems And Psd Systems Of Cmrl Phase Ii.
|
| Description |
Independent Safety Assessment Services For Signalling, Train Control Systems And Psd Systems Of Cmrl Phase Ii.
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_CMRL_761669_1 |
|
Reference Number |
CMRL/PHASE II/SYS/ISA03/2023 |
| Tender Fee | 32000 |
| EMD | 12.3 Lakh |
| Tender Value | - |
| Place | Chennai Metro Rail Limited |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | October 25, 2023 22:30 |
| End Date |
Expired
31/10/2023
Expired 1082 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tor for selection of agency for third party independent techno-financial and legal audit of the capex (build) phase of the integrated command and control centre (iccc)
Tor selection of agency for third party independent techno-financial and legal audit of the capex (build) phase of the integrated command and control centre (iccc)
Read moreConstruction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com
Construction of sarkhej-dholera semi high-speed double railway line, including spur lines to lothal nmhc and dholera airport terminal; comprising civil works, which includes formation & viaduct, bridges, station buildings, & associated works; track system (ballasted & blt), overhead traction system including electrical general services; signalling & telecommunication system, operating control centre, integration of all systems complete in all respect including testing & com
Read moreTraction transformer complete with cooling system & accessories like h.t. cable along with protection shield in passenger compartment and underframe area, thermostat etc. related protection equipment and with safety chain arrangement including termination crimping lugs, cable markers with heat shrinkable sleeves for power and control cables, equipment mounting and earthing hardware and accessories as per attached specification suitable for 3 phase memu (medha, on-board).
Traction transformer complete with cooling system & accessories like h.t. cable along with protection shield in passenger compartment and underframe area, thermostat etc. related protection equipment and with safety chain arrangement including termination crimping lugs, cable markers with heat shrinkable sleeves for power and control cables, equipment mounting and earthing hardware and accessories as per attached specification suitable for 3 phase memu (medha, on-board).
Read moreNail file,neck tray,re-bonding boards,vacuum suction,divider spring,growler,function generator,immersion heater,inverter 1 kva,plane smoothing,soldering iron copper bit,cut out relays,,reverse current relays,motor ac single phase 230 v,transformer single phase, 1 kva, 240 and 415v 50 hz core type, air cooled .,stepper motor with digital control,shaded pole motor fractional hp,,wiring board on stand 3 meters x 1meter,hammer extractor type,caliper inside spring,drill hand brace,ac starter resistance type starter,star delta strater soft starter,soldering iron,led lighting system measurement of power, voltage, current, power factor and light output performance of different lighting products like led,,ventilation system,spanners ,clyburn,measuring tape,thread cutter,hammer sledge,multi angle magnetic clamp set,anvil 24 sq. inches working area with stand,solid state solar base single phase energy meter,wall jumper octagonal,coil winding machine,earth copper plate,safety belt with,rubber gloves,solar charge controll
Nail file,neck tray,re-bonding boards,vacuum suction,divider spring,growler,function generator,immersion heater,inverter 1 kva,plane smoothing,soldering iron copper bit,cut out relays,,reverse current relays,motor ac single phase 230 v,transformer single phase, 1 kva, 240 and 415v 50 hz core type, air cooled .,stepper motor with digital control,shaded pole motor fractional hp,,wiring board on stand 3 meters x 1meter,hammer extractor type,caliper inside spring,drill hand brace,ac starter resistance type starter,star delta strater soft starter,soldering iron,led lighting system measurement of power, voltage, current, power factor and light output performance of different lighting products like led,,ventilation system,spanners ,clyburn,measuring tape,thread cutter,hammer sledge,multi angle magnetic clamp set,anvil 24 sq. inches working area with stand,solid state solar base single phase energy meter,wall jumper octagonal,coil winding machine,earth copper plate,safety belt with,rubber gloves,solar charge controll
Read moreIndependent safety assessment services for train control and signalling and platform screen gates system for mumbai metro rail project.
Independent safety assessment services for train control and signalling and platform screen gates system for mumbai metro rail project.
Read moreIndependent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Independent safety assessment services for signalling and train control system for reach-6, phase-2a and phase-2b and platform screen door/gates systems of reach-5, reach-6, phase-2a and phase-2b of phase-ii.
Read moreIndependent safety assessment services for train control and signalling system and platform screen gates (psg) for mumbai metro line 2b project.
Independent safety assessment services for train control and signalling system and platform screen gates (psg) for mumbai metro line 2b project.
Read moreIndependent safety assessment services for signalling and train control and platform screen door systems for line 4 and 4a line 5 and line 6 of mumbai metro rail projects
Independent safety assessment services for signalling and train control and platform screen door systems for line 4 and 4a line 5 and line 6 of mumbai metro rail projects
Read moreSignalling and train control system and telecommunication systems
Design, manufacture, supply, installation, testing and commissioning of signalling and train control system and telecommunication systems for bengaluru suburban rail project
Read moreIndependent safety assessment services for signalling and train control system for line-10 and platform gates and platform screen doors system for line-7 extn, line-8 extn and line-10 of delhi mrts ph-iv.
Independent safety assessment services for signalling and train control system for line-10 and platform gates and platform screen doors system for line-7 extn, line-8 extn and line-10 of delhi mrts ph-iv.
Read moreof your Industry type