Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of New Pwd (Band R) Rest House At Barwala In Distt. Hisar (Pdg. Additional Cctv Camera And Ups Etc.)
|
Description |
Construction Of New Pwd (Band R) Rest House At Barwala In Distt. Hisar (Pdg. Additional Cctv Camera And Ups Etc.)
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_450610_1 |
Reference Number |
20252E8D7963 E98C 4CBF 9815 2C6A454E727D666BAR |
Tender Fee | 2180 |
EMD | 34728 |
Tender Value | |
Place | Barwala |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=528173 |
Start Date | June 04, 2025 19:30 |
End Date |
11/06/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreBtps(4x270mw)
Design, engineering, manufacture, supply, assembly, testing at manufacturers works, inspection, packing for inland freight, forwarding, transit insurance, delivery for site, erection, supervision, testing and commissioning of new conveying system for di of raw coal including modification works in the existing crusher house and construction of space frame structure raw coal storage shed with all accessories, mandatory spares, tools and tackles including all mechanical, electrical, cni, civil, structural works, dust suppression, dust extraction and fire fighting system at btps(4x270mw) project.
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of pathway at sisodiya garden in front of bsnl office house no. bg-210 under ward no. 29 zone no.07
Construction of pathway at sisodiya garden in front of bsnl office house no. bg-210 under ward no. 29 zone no.07
Read moreConstruction of parking plaza and streetscape at dandeshwar, jageshwar distt. almora under jageshwar dham master plan
Construction of parking plaza and streetscape at dandeshwar, jageshwar distt. almora under jageshwar dham master plan
Read moreof your Industry type