Tender Details
Particulars | Details |
---|---|
Title |
7th Mile Takdah Glenburn Fatak Road Clearing Drain, Cd Structures , Drops And Guides, Mixed Slip Clearance And Jungle Cutting From Ch. 0.00 Kmp To 8.00 Km
|
Description |
7th Mile Takdah Glenburn Fatak Road Clearing Drain, Cd Structures , Drops And Guides, Mixed Slip Clearance And Jungle Cutting From Ch. 0.00 Kmp To 8.00 Km Under Darjeeling Highway Division In The District Of Darjeeling During The Year 2025 26
|
Organisation | PUBLIC WORKS DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WBPWD_835737_2 |
Reference Number |
WBPWD(R)/NIT1e/25-26/AE/SHSDII |
Tender Fee | 0 |
EMD | 6125 |
Tender Value | |
Place | takdah |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1862415 |
Start Date | April 21, 2025 17:30 |
End Date |
05/05/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Mtc. of road from nh-208(harina-ailmara) road to thakhirai para in between ch.0.00km to ch.0.480km during the year 2024-25/ sh - gsb (ch.0.00 km to ch.0.150km), wbm-iii, carpeting, sand seal coat and placing of cc blocks etc. (3rd call)
Read moreMtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Mtc. of road from ice cream factory (near matabari school) to bramhachara road ch.0.00 km to ch.0.65 km under matabari block, gomati, tripura/s.h patch repairing, patch carpetting and allied works during the year 2025-26. (group-i)
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 8.00km to ch 12.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 4.00km to ch 8.00 km.
Read moreMtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Mtc of road from kambaltilla to anandabazar (l- 12.00km) under dasda sub-division, pwd(rnb) during the year 2025-26/ sh gsb, patch wbm-3, patch carpeting, seal coat and surface drain etc portion from ch 0.00km to ch 4.00 km.
Read morePeriodical repair of road from bhuban motorstand to shanmura spt bridge via lankamura main road (ch.0.00 km to 0.900 km) under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(
Periodical repair of road from bhuban motorstand to shanmura spt bridge via lankamura main road (ch.0.00 km to 0.900 km) under construction sub_division_ii pwd(randb) during the year 2025_26_sh_ road side drain ,grouting, carpeting, seal coat etc.(
Read moreWbpwd/ae/dj/niet no.02 (sl.no.2) of 2025-2026 (2nd call)
Regular clearance of ghoom simana road side drain and cross road drains and jungle cutting in chainage between kmp 0.00 to 16.50 kmp under pwd., darjeeling sub division of darjeeling division during the year 2025-2026
Read moreSlip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 0.00 to 93.00 stretch of nh-309a during mansoon season 2025 -26 and upcoming duration.
Slip clearance work by back hoe loader and tracked hydraulic exacavator for smooth and safe traffic from km 0.00 to 93.00 stretch of nh-309a during mansoon season 2025 -26 and upcoming duration.
Read moreUprooting jungle and clearance of internal section of bhodi escape drain from km. 0.000 to km. 6.000 and from km. 10.00 to km. 23.050 in bara tehsil of district prayagra
Uprooting jungle and clearance of internal section of bhodi escape drain from km. 0.000 to km. 6.000 and from km. 10.00 to km. 23.050 in bara tehsil of district prayagra
Read morePr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Pr of road from pecharthal laljuri road to shantinagar awc l 0 900 km during the year 2025 26 sh surface drain patch metalling carpeting seal coat and protection works from ch 0 00km to ch 0 90 km
Read moreof your Industry type