Tender Details
Particulars | Details |
---|---|
Title |
Replace With New Pipe Range Of Vertical Borehole From Surface To Dishergarh R Iv Seam At 0 Dip In Between 1st Dip 2nd Level Of Ningha Colliery
|
Description |
Replace With New Pipe Range Of Vertical Borehole From Surface To Dishergarh R Iv Seam At 0 Dip In Between 1st Dip 2nd Level Of Ningha Colliery
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_324719_1 |
Reference Number |
SS/GM/AMPCD/25-26/VB/NGM/75 Dated-02.01.2025 |
Tender Fee | 0 |
EMD | 4800 |
Tender Value | |
Place | Ningha Colliery Satgram-Sripur Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336598 |
Start Date | January 04, 2025 16:30 |
End Date |
10/01/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreShifting of paper reels from paper godown to dip or any other godown with in factory premises at tnpl unit1
Shifting of paper reels from paper godown to dip or any other godown with in factory premises at tnpl unit1
Read moreCleaning of sand bunker and vertical borehole from surface to kenda r vi seam at north jambad unit of bahula colliery under kenda area ecl
Cleaning of sand bunker and vertical borehole from surface to kenda r vi seam at north jambad unit of bahula colliery under kenda area ecl
Read moreConstruction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)
Construction of new 4 lane with paved shoulder access controlled coastal highway from rameshwar to puri (km.0 to km. 47.340) on hybrid annuity mode in the state of odisha (package i)
Read moreConstruction of new 4 lane with paved shoulder access controlled coastal highway from erasama to paradeep (km. 137.00 to km. 163.200) on hybrid annuity mode in the state of odisha (package iv)
Construction of new 4 lane with paved shoulder access controlled coastal highway from erasama to paradeep (km. 137.00 to km. 163.200) on hybrid annuity mode in the state of odisha (package iv)
Read moreTransport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Read moreCollection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.
Collection of 450 nos. of old and damaged stools from different locations in ug and its transportation to surface and repairing the same at surface for use in belt conveyors of nandira colliery.
Read moreModernization of existing passenger lift installed in new opd at igmc shimla. sh addition of 2 no. elevator floors level i.e. 1st and 2nd floor.
Modernization of existing passenger lift installed in new opd at igmc shimla. sh addition of 2 no. elevator floors level i.e. 1st and 2nd floor.
Read moreStrengthening of road from new nh 4 road to belliyappa nagar link ammananthangal road km 0/0-0/840 in walajah block at ranipet district mgsmt 2025-26
Strengthening of road from new nh 4 road to belliyappa nagar link ammananthangal road km 0/0-0/840 in walajah block at ranipet district mgsmt 2025-26
Read moreof your Industry type