Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of P.C.C Road From Village Hudangda Nh 75 To Bhuiya Devgaon (Bandgaon) (L 1200 M)
|
| Description |
Construction Of P.C.C Road From Village Hudangda Nh 75 To Bhuiya Devgaon (Bandgaon) (L 1200 M)
|
| Organisation | NREP WEST SINGHBHUM | State Govt. and UT |
| Tender Id | 2024_NREPW_84788_1 |
|
Reference Number |
EE/NREP/CHAIBASA/12/23-24(3rd Call)_Gr1 |
| Tender Fee | 10000 |
| EMD | 2.5 Lakh |
| Tender Value | - |
| Place | BANDGAON |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=113737 |
| Start Date | March 05, 2024 16:30 |
| End Date |
Expired
11/03/2024
Expired 947 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of p.c.c road from raidih khatkhor (nh road) to khatkhor basti (elrik tirkey house) at village khatkhor, panchayat silam, raidih block, dist- gumla.
Construction of p.c.c road from raidih khatkhor (nh road) to khatkhor basti (elrik tirkey house) at village khatkhor, panchayat silam, raidih block, dist- gumla.
Read moreDevelopment of roads from nh-08 to mahadeb kum (l-4.81 k.m.) and bokafa ashram school playground to bagafa bazar (l-0.30 k.m)
Bokafa santirbazar road to bokafa santirbazar road via jitendra mitra house (l-1.25 k.m.) (different roads under pwd (randb) santirbazar sub-division) /sh-wbm-iii, carpeting, re-carpeting, seal coat, cd works and paver block etc.
Read moreImprovement/upg of lane no. 4 new colony naseembagh bwo p/l 75 mm wmm, 50mm bm, 50mm dense bm.
Improvement/upg of lane no. 4 new colony naseembagh bwo p/l 75 mm wmm, 50mm bm, 50mm dense bm.
Read moreCs for preparation of feasibility report and dpr for upgradation to 4 l of shildag to parwa more sec from km 57.049 to km 79.147 of nh 139 (old nh 98) and jh/bihar border to chandwa sec from km 11.200 to km 117.200 of nh 22 (old nh 99) in jharkhand
Cs for preparation of feasibility report and dpr for upgradation to 4 l of shildag to parwa more sec from km 57.049 to km 79.147 of nh 139 (old nh 98) and jh/bihar border to chandwa sec from km 11.200 to km 117.200 of nh 22 (old nh 99) in jharkhand
Read moreImprovement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Improvement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Read moreStrengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of kuchwahi basti road (nh-75 ext.old part) road length- 2.00 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreStrengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Strengthening of kubari basti road (nh-75 ext.old part) road length- 1.71 km., under pwd sub division. sidhi, distt-sidhi pwd road and bridges sor w.e.f. 11.04.2025
Read moreConstruction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
Construction of 4 l of ujjain jhalawar sec of nh 552g from ch.0.000 village khilchipura to ch.86.500 village aakli kadiya (pkg 1) in the state of madhya pradesh on epc mode under nh(o).
Read moreDevelopment of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Development of roads from i) kma road to bagmara road (l-1.20 km). ii) nh-8 to hadukalak para ( l-1.00 km). iii) kulai hs school approach road ( l-0.30 km), (total length -2.50 km)/ sh- grouting, wbm-iii, re-carpeting, pucca drain etc.
Read moreConstruction of l/r bkn-sgnr road nh-62 (from 12.50 km) to chak 489 rdr (bishnoiyo ki dhaniyan) length 3.00 km kums bikaner (grain)
Construction of l/r bkn-sgnr road nh-62 (from 12.50 km) to chak 489 rdr (bishnoiyo ki dhaniyan) length 3.00 km kums bikaner (grain)
Read moreof your Industry type