Tender Details
Particulars | Details |
---|---|
Title |
Engagement Of User Fee Collection Agency On The Basis Of Eq Through E Tender At Ramdevra Fee Plaza At Km 209.500 For Phalodi Jaisalmer Section Of Nh 15 To Two/Four Lane With Paved Shoulder From Km 163.400 To Km 323.857 In The State Of Rajasthan
|
Description |
Engagement Of User Fee Collection Agency On The Basis Of Eq Through E Tender At Ramdevra Fee Plaza At Km 209.500 For Phalodi Jaisalmer Section Of Nh 15 To Two/Four Lane With Paved Shoulder From Km 163.400 To Km 323.857 In The State Of Rajasthan
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | NHAI HQ |
Link |
AAAAAAAAAA Login to view |
Start Date | April 17, 2025 21:30 |
End Date |
24/04/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreConstruction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Construction of two lane with paved shoulder of ghatol bypass from km 133.250 to km 140.950 of nh-56 (old nh-113) on epc mode in the state of rajasthan
Read moreRehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode
Rehabilitation and upgradation of kolde kalamba to visarwadi nh-6 nandurbar state highway design ch. km 50.200 to km 56.800 62.400 to 100.400 nh section nh752-g to two lane with paved shoulder 4 lane in the state of maharashtra on epc mode.
Read moreDevelopment and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.
Development and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreRehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Rehabilitation and up-gradation from single lane to two lane with paved shoulder from existing km 195.175 to km 220.00 (design chainage from km 71.300 to km 95.947 paligad to jankichatti) on nh 134 in the state of uttarakhand under epc mode
Read moreWidening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Widening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Read moreof your Industry type