Tender Details
Particulars | Details |
---|---|
Title |
Topographical Survey For Ash Pipeline Corridor For The Proposed Sipat Stpp Stage Iii, Bilaspur, Chattisgarh.
|
Description |
Topographical Survey For Ash Pipeline Corridor For The Proposed Sipat Stpp Stage Iii, Bilaspur, Chattisgarh.
|
Organisation | NTPC Limited(NTPC) |
Tender Id | 2023_NTPC_77442_1 |
Reference Number |
NTPC/USSC-CPG2/9900261177 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | 0 |
Place | Sipat Super Thermal Power Proj |
Link | https://eprocurentpc.nic.in |
Start Date | July 01, 2023 19:30 |
End Date |
07/07/2023 ( Expired 683 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Geotechnical investigation for ash dyke area and make-up water corridor for meja thermal power project stage-ii.
Geotechnical investigation for ash dyke area and make-up water corridor for meja thermal power project stage-ii.
Read moreProposed construction of retaining wall for nala adjcent to survey no 133 at songirwadi wai first stage
Proposed construction of retaining wall for nala adjcent to survey no 133 at songirwadi wai first stage
Read moreTopographical survey for proposed lower kopili 50mw solar spv plant,
Topographical survey for proposed lower kopili 50mw solar spv plant,&#x0d apgcl, longku, dima hasao, assam-788931.
Read moreRelocation of ms pipeline for siding ii with 10 nos sprinkler point, 08 nos of fire fighting points , 4 nos of fog cannons along with extension of input water supply pipeline fro midpoint of siding iii to new proposed pond and water supply pipeline
Relocation of ms pipeline for siding ii with 10 nos sprinkler point, 08 nos of fire fighting points , 4 nos of fog cannons along with extension of input water supply pipeline fro midpoint of siding iii to new proposed pond and water supply pipeline
Read moreAsh slurry pipes and awrs system package for singrauli super thermal power project stage-iii (2 x 800 mw)
Ash slurry pipes and awrs system package for singrauli super thermal power project stage-iii (2 x 800 mw)
Read moreDust suppression and water systems package for singrauli stpp stage-iii (2x800 mw)
Dust suppression and water systems package for singrauli stpp stage-iii (2x800 mw)
Read moreSupply laying installation testing and commissioning of instrumentation cables and control cables for fgd plant of ramagundam stpp unit 7 stage iii 1x500mw lot 5
Supply laying installation testing and commissioning of instrumentation cables and control cables for fgd plant of ramagundam stpp unit 7 stage iii 1x500mw lot 5
Read moreTtps mech ii ahp attending breakdown maintenance works in unit i ii iii heat exchanger discharge pipe line tunnel pipe line from transformer yard to stage i ii ash water sump and high pressure pipe line fittings for the period from 01 04 2025 to
Ttps mech ii ahp attending breakdown maintenance works in unit i ii iii heat exchanger discharge pipe line tunnel pipe line from transformer yard to stage i ii ash water sump and high pressure pipe line fittings for the period from 01 04 2025 to
Read moreContracts for civil maint. works related to ash dyke, ofl, awrs andsurrounding roads, drains, ash pipe corridor, drone survey of ashdyke at ntpc kudgi
Contracts for civil maint. works related to ash dyke, ofl, awrs andsurrounding roads, drains, ash pipe corridor, drone survey of ashdyke atntpc kudgi
Read moreSupply, installation, testing and commissioning/ earthing/ foundation andany civil work for high mast led lighting tower of height 30m along with16 nos. 350w led flood light at ntpc sipat for stage-iii
Supply, installation, testing and commissioning/ earthing/ foundation andany civil work for high mast led lighting tower of height 30m along with16 nos. 350w led flood light at ntpc sipat for stage-iii
Read moreof your Industry type