Tender Details

Particulars Details
Title
Topographical Survey For Ash Pipeline Corridor For The Proposed Sipat Stpp Stage Iii, Bilaspur, Chattisgarh.
Description
Topographical Survey For Ash Pipeline Corridor For The Proposed Sipat Stpp Stage Iii, Bilaspur, Chattisgarh.
Organisation NTPC Limited(NTPC)
Tender Id 2023_NTPC_77442_1
Reference
Number
NTPC/USSC-CPG2/9900261177
Tender Fee 0
EMD 0
Tender Value 0
Place Sipat Super Thermal Power Proj
Link https://eprocurentpc.nic.in
Start Date July 01, 2023 19:30
End Date

07/07/2023 ( Expired 683 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Geotechnical investigation for ash dyke area and make-up water corridor for meja thermal power project stage-ii.

Geotechnical investigation for ash dyke area and make-up water corridor for meja thermal power project stage-ii.

Read more
Proposed construction of retaining wall for nala adjcent to survey no 133 at songirwadi wai first stage

Proposed construction of retaining wall for nala adjcent to survey no 133 at songirwadi wai first stage

Read more
Topographical survey for proposed lower kopili 50mw solar spv plant,

Topographical survey for proposed lower kopili 50mw solar spv plant,&amp#x0d apgcl, longku, dima hasao, assam-788931.

Read more
Relocation of ms pipeline for siding ii with 10 nos sprinkler point, 08 nos of fire fighting points , 4 nos of fog cannons along with extension of input water supply pipeline fro midpoint of siding iii to new proposed pond and water supply pipeline

Relocation of ms pipeline for siding ii with 10 nos sprinkler point, 08 nos of fire fighting points , 4 nos of fog cannons along with extension of input water supply pipeline fro midpoint of siding iii to new proposed pond and water supply pipeline

Read more
Ash slurry pipes and awrs system package for singrauli super thermal power project stage-iii (2 x 800 mw)

Ash slurry pipes and awrs system package for singrauli super thermal power project stage-iii (2 x 800 mw)

Read more
Dust suppression and water systems package for singrauli stpp stage-iii (2x800 mw)

Dust suppression and water systems package for singrauli stpp stage-iii (2x800 mw)

Read more
Supply laying installation testing and commissioning of instrumentation cables and control cables for fgd plant of ramagundam stpp unit 7 stage iii 1x500mw lot 5

Supply laying installation testing and commissioning of instrumentation cables and control cables for fgd plant of ramagundam stpp unit 7 stage iii 1x500mw lot 5

Read more
Ttps mech ii ahp attending breakdown maintenance works in unit i ii iii heat exchanger discharge pipe line tunnel pipe line from transformer yard to stage i ii ash water sump and high pressure pipe line fittings for the period from 01 04 2025 to

Ttps mech ii ahp attending breakdown maintenance works in unit i ii iii heat exchanger discharge pipe line tunnel pipe line from transformer yard to stage i ii ash water sump and high pressure pipe line fittings for the period from 01 04 2025 to

Read more
Contracts for civil maint. works related to ash dyke, ofl, awrs andsurrounding roads, drains, ash pipe corridor, drone survey of ashdyke at ntpc kudgi

Contracts for civil maint. works related to ash dyke, ofl, awrs andsurrounding roads, drains, ash pipe corridor, drone survey of ashdyke atntpc kudgi

Read more
Supply, installation, testing and commissioning/ earthing/ foundation andany civil work for high mast led lighting tower of height 30m along with16 nos. 350w led flood light at ntpc sipat for stage-iii

Supply, installation, testing and commissioning/ earthing/ foundation andany civil work for high mast led lighting tower of height 30m along with16 nos. 350w led flood light at ntpc sipat for stage-iii

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise