Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Maintenance Of Road From Mill Chowmuhani To Railbridge Road Via Adjacent Roads Under Pwd (Rn B) Kakraban Sub Division/ Sh Protection Work, Earth Filling, Turfing,Road Marking Etc With Allied Works During The Year 2025 26
|
| Description |
Maintenance Of Road From Mill Chowmuhani To Railbridge Road Via Adjacent Roads Under Pwd (Rn B) Kakraban Sub Division/ Sh Protection Work, Earth Filling, Turfing,Road Marking Etc With Allied Works During The Year 2025 26
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2025_CEPWD_62238_1 |
|
Reference Number |
DNIT No.21/EE/PWD/UDP/R/2025-26 |
| Tender Fee | 1000 |
| EMD | 48476 |
| Tender Value | - |
| Place | Udaipur |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=63303 |
| Start Date | June 03, 2025 22:35 |
| End Date |
Expired
19/06/2025
Expired 483 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reinvited job no. 322.2026 filling in good earth and turfing of lawn with selection no 1 grass in park near h. no. 1203 old housing board, sec 1 and 4, hisar with one year maintenance and defect liability free of cost.
Detailed estimate for annual mtc. estimate of horticulture works in sector-1and4, hisar for the year 2026-2027.
Read moreSurf wk incl, gsb, wmm, bc, dbm incl prime coat, tack coat and earth filling and edge marking with thermo plastic paint bet km 0.00 to km 9.00 and km 14.00 to km 22.00 on road zingki bridge to pungro under project sewak in nagaland state
Surf wk incl, gsb, wmm, bc, dbm incl prime coat, tack coat and earth filling and edge marking with thermo plastic paint bet km 0.00 to km 9.00 and km 14.00 to km 22.00 on road zingki bridge to pungro under project sewak in nagaland state
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreRasin cast spout assy,spout filling with connector r y b,front insulated connector r phase,front insulated connector y phase phase,front insulated connector b phase,rear insulated connector r phase,rear insulated connector y phase,rear insulated connector b phase,instrument control box,vertical isolating trolley,earth leakage relay with cbct,power converter 110 v ac to 110 v dc,tripping coil,mechanism for tripping coil,master trip relay,epoxy resin cast potential transformer 11 kv 110v,digital protection relay,epoxy resin cast current transformer,side cable box
Rasin cast spout assy,spout filling with connector r y b,front insulated connector r phase,front insulated connector y phase phase,front insulated connector b phase,rear insulated connector r phase,rear insulated connector y phase,rear insulated connector b phase,instrument control box,vertical isolating trolley,earth leakage relay with cbct,power converter 110 v ac to 110 v dc,tripping coil,mechanism for tripping coil,master trip relay,epoxy resin cast potential transformer 11 kv 110v,digital protection relay,epoxy resin cast current transformer,side cable box
Read moreProtection work by ash filling with turfing including some ancillary works at old ash dumped area adjacent to ash pond-1 at stps.
Protection work by ash filling with turfing including some ancillary works at old ash dumped area adjacent to ash pond-1 at stps.
Read moreProtection work by ash filling with turfing including some ancillary works at old ash dumped area adjacent to ash pond-1 at stps
Protection work by ash filling with turfing including some ancillary works at old ash dumped area adjacent to ash pond-1 at stps
Read moreProtection work by ash filling with turfing including some ancillary works at old ash dumped area adjacent to ash pond-1 at stps.
Protection work by ash filling with turfing including some ancillary works at old ash dumped area adjacent to ash pond-1 at stps.
Read moreLand development by earth filling with earth protection wall at kanakpur sasan
Land development by earth filling with earth protection wall at kanakpur sasan under booth no 82 , priority no 6, ward no xxi within contai municipality
Read moreFilling of local earth adjacent to mp boys hostel at igu,meerpur
Filling of local earth adjacent to mp boys hostel at igu,meerpur
Read moreImprovement and upgradation of park bhalwal brahamna by way good earth filling, turfing with other allied works.
Improvement and upgradation of park bhalwal brahamna by way good earth filling, turfing with other allied works.
Read moreof your Industry type