Ttps Mech Ii Tm Ii Unit Iv V Clearing The Coal Ash Dust From The 0mtr Repair Bay Floor Turbine 5mtr 7 5mtr 10 5 Mtr Floor Area Condenser Pit Sump Pit Cleaning Work In Unit Iv V For The Period From 01 04 2024 To 31 03 2025
|
Description |
Ttps Mech Ii Tm Ii Unit Iv V Clearing The Coal Ash Dust From The 0mtr Repair Bay Floor Turbine 5mtr 7 5mtr 10 5 Mtr Floor Area Condenser Pit Sump Pit Cleaning Work In Unit Iv V For The Period From 01 04 2024 To 31 03 2025
|
Organisation | Government of Tamil Nadu |
Tender Id | 2023_EB_404946_1 |
Reference Number |
CE/TTPS/SE/M-II/No.25/2024-25 |
Tender Fee | 0 |
EMD | 9900 |
Tender Value | |
Place | O/o SE M II / TTPS |
Link | https://tntenders.gov.in |
Start Date | December 30, 2023 23:30 |
End Date |
18/01/2024 ( Expired 461 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 59000 mt fly ash in unit i to v from the date of handing over of site
Read moreTtps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Ttps mech ii ahp unit 1 2 3 4 5 esp operation and maintenance of pdfac system and wet sluice system including materials for the collection of 58000 mt fly ash in unit i to v from the date of handing over of site
Read moreKtps-v-cam-transportation of material, tp, ms erw pipes, various scrap material, ash, coal, silt debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 to 31 -03 - 2026-reg.
Read moreSp.114 nctps ii es circle mrt division unit ii rectification of gear mechanism failure in actuators at turbine and boiler area of unit ii under rate contract basis for a period of 360 days from 01 04 2025 under open tender system upto 31 03 202
Sp.114 nctps ii es circle mrt division unit ii rectification of gear mechanism failure in actuators at turbine and boiler area of unit ii under rate contract basis for a period of 360 days from 01 04 2025 under open tender system upto 31 03 202
Read moreSp.120 nctps ii es circle em i division sd iv routine maintenance works on unit i and ii turbine auxiliary motors and unit batteries and battery chargers from the date of commencement of work for the period up to 31 march 2026 from the date of t
Sp.120 nctps ii es circle em i division sd iv routine maintenance works on unit i and ii turbine auxiliary motors and unit batteries and battery chargers from the date of commencement of work for the period up to 31 march 2026 from the date of t
Read moreTtps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Ttps mech ii tm i clearing the choke in trench lines and trench pits by removing the coal dust and debris as and when required in turbine zero meter floor and shift it to outside area in unit i ii iii for the period from 01 04 2025 to 31 03 2026
Read moreTtps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Ttps mech ii bm unit iv v boiler inspection checking and opening closing of valves in deaerator prds boiler from 18mtr to 52mtr inspecting the rise in slag level through 8mtr peep hole door and take necessary action for poking opening closing of burn
Read moreTtps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Ttps mech ii ahp breakdown maintenance works in ash slurry disposal lines of unit iv v for the period from 01 04 2025 to 3103 2026
Read moreTtps mech ii ahp replacement of m s trapezoidal discharge tray for ash slurry disposal lines of unit iv v
Ttps mech ii ahp replacement of m s trapezoidal discharge tray for ash slurry disposal lines of unit iv v