Tender Details
Particulars | Details |
---|---|
Title |
Ttps Echp Ii Checking And Inspection Of All The Secondary Crusher Free End Side And Fixed End Side Bearing At Rotor Side And Drive Motor Side At Sc 1 A, 2 A, Sc 1 B Sc 2 B And Replace At Sch Ii.
|
Description |
Ttps Echp Ii Checking And Inspection Of All The Secondary Crusher Free End Side And Fixed End Side Bearing At Rotor Side And Drive Motor Side At Sc 1 A, 2 A, Sc 1 B Sc 2 B And Replace At Sch Ii.
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_508036_1 |
Reference Number |
CE/SE/MI/TTPS/133/2024-2025 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=604340 |
Start Date | December 06, 2024 14:30 |
End Date |
23/12/2024 ( Expired 119 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Job work required for vt pump repairs and maintenance including required spares and repairs of related mecha components such as thrust bearing sluice valves actuator etc at punadi lis stage 1 2a 2b and stage 3 and visapur lis stage 1a 1b stage 2
Job work required for vt pump repairs and maintenance including required spares and repairs of related mecha components such as thrust bearing sluice valves actuator etc at punadi lis stage 1 2a 2b and stage 3 and visapur lis stage 1a 1b stage 2
Read moreEchp-ii- shifting and replacement of secondary crusher-1b ht motor by the spare motor including transporting of motor and alignment works etc., kirloskar make, 820 kw, 6.6kv, 1483 rpm, sl.no.39008032
Echp-ii- shifting and replacement of secondary crusher-1b ht motor by the spare motor including transporting of motor and alignment works etc., kirloskar make, 820 kw, 6.6kv, 1483 rpm, sl.no.39008032
Read moreTtps- echp-i-dismantling and rewinding of failed 3 phase ac 415v 7.5kw induction motor of 10t electrical hoist e4 at secondary crusher house-i
Ttps- echp-i-dismantling and rewinding of failed 3 phase ac 415v 7.5kw induction motor of 10t electrical hoist e4 at secondary crusher house-i
Read moreSupply of secondary crusher 1a 1b and 2a 2b internal parts of breaker plates, screen plate upper and lower with ersunk head bolt with nut at sch ii
Supply of secondary crusher 1a 1b and 2a 2b internal parts of breaker plates, screen plate upper and lower with ersunk head bolt with nut at sch ii
Read moreEchpii attending breakdown and prive mechanical maintenance in bfd 4a 4b, sc 1a 1b, 2a 2b, eds 1a 1b, 2a 2b , sfd 2a 2b and conveyor 48a1 48b1 in secondary crusher houseii.
Echpii attending breakdown and prive mechanical maintenance in bfd 4a 4b, sc 1a 1b, 2a 2b, eds 1a 1b, 2a 2b , sfd 2a 2b and conveyor 48a1 48b1 in secondary crusher houseii.
Read moreWork of repairing of both end bearing housing, checking of rotor for any run-out and attending etc balancing of rotor, normalization of vibration and complete assembly of jyoti make 6.6kv, 435 kw acw pump motor for unit 3 and 4 at ssgts, mppgcl, brs.
Work of repairing of both end bearing housing, checking of rotor for any run-out and attending etc balancing of rotor, normalization of vibration and complete assembly of jyoti make 6.6kv, 435 kw acw pump motor for unit 3 and 4 at ssgts, mppgcl, brs.
Read moreEchp-ii- removal of coal chocking in primary crusher -2a/2b bend chute and all discharge chute for conveyor-48a b, bfd-2a 2b and receiving chute for bfd-3a3b during rainy season and wet coal discharging period at pch-ii.
Echp-ii- removal of coal chocking in primary crusher -2a/2b bend chute and all discharge chute for conveyor-48a b, bfd-2a 2b and receiving chute for bfd-3a3b during rainy season and wet coal discharging period at pch-ii.&#x0d
Read moreTtps- echp-ii- checking and inspection of all the secondary crusher free end side and fixed end side bearing at rotor side and drive motor side at sc-1a, 2a, sc-1b sc-2b and replace at sch-ii.
Ttps- echp-ii- checking and inspection of all the secondary crusher free end side and fixed end side bearing at rotor side and drive motor side at sc-1a, 2a, sc-1b sc-2b and replace at sch-ii.
Read moreEchp-ii- dismantling of existing power control cable panel in the electrically operated hoists-4 nos. and re-erecting the panel to ground floor of junction towers at conveyor-48a b head end-2 nos., rbfd-1a 1b west and conveyor-64 tail end.
Echp-ii- dismantling of existing power control cable panel in the electrically operated hoists-4 nos. and re-erecting the panel to ground floor of junction towers at conveyor-48a b head end-2 nos., rbfd-1a 1b west and conveyor-64 tail end.
Read moreTtps es circle em ii complete overhauling of 2 nos lpw motors and 2 nos cg motors and fabrication of motor bearing end cover sleeve for the motors at ahp stage i
Ttps es circle em ii complete overhauling of 2 nos lpw motors and 2 nos cg motors and fabrication of motor bearing end cover sleeve for the motors at ahp stage i
Read moreof your Industry type