Tender Details

Particulars Details
Title
Co Link Road To Village Kawalta Km 0.00 To 3.00 Sh Co 6.00 Mtr Span Rcc Slab Culvert At Rd 1.060
Description
Co Link Road To Village Kawalta Km 0.00 To 3.00 Sh Co 6.00 Mtr Span Rcc Slab Culvert At Rd 1.060
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_88880_2
Reference
Number
1566-68 Dated-06.06.2024
Tender Fee 500
EMD 37700
Tender Value
Place JUBBAL
Link
View Original Tender Notice

https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=131929

Start Date June 15, 2024 17:00
End Date
Expired 21/06/2024

Expired 715 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26

Imp of road frm d.k. rd to k.k. rd via zela parisad office l 1.95 km portion from 0.00 to 1.70 km under part-xi impl. of sna sparsh mode) of the sh gsb, wbm 2,wbm 3, seal coating, rd side drain, road signage etc. comp. job no.tpcom183 2025 26

Read more
Construction of 46 mtr span through type steel truss girder motorable bridge at km 4th rd 400- 450 on bhaga to lalesa marel road under package no. jk14-556, regular pmgsy (batch-i, 2017-18), block reasi, district reasi

Construction of 46 mtr span through type steel truss girder motorable bridge at km 4th rd 400- 450 on bhaga to lalesa marel road under package no. jk14-556, regular pmgsy (batch-i, 2017-18), block reasi, district reasi

Read more
Construction and maintenance of road from l033-(link road) dheeran to thounth (using waste plastics), package no. jk14-4260, pmgsy-iv (batch-i, 2026-27), block parli dhar, district udhampur, (length - 3.00 km)

Construction and maintenance of road from l033-(link road) dheeran to thounth (using waste plastics), package no. jk14-4260, pmgsy-iv (batch-i, 2026-27), block parli dhar, district udhampur, (length - 3.00 km)

Read more
Construction of pcc road with rcc drain and slab from vijay choudhary house to santosh yadav house at ward no-09 under nagar parishad, chakradharpur

Construction of pcc road with rcc drain and slab from vijay choudhary house to santosh yadav house at ward no-09 under nagar parishad, chakradharpur

Read more
Construction of w.b.m. road work at shivpuri link road to village khada ward no.66 zone 25.file no.22/26x3/5.

Construction of w.b.m. road work at shivpuri link road to village khada ward no.66 zone 25.file no.22/26x3/5.

Read more
Construction and maintenance of road from l037-(link road) kohag to kudetar via dallian road rd 6.200 to tumbu package no. jk07-4521, pmgsy-iv, batch-i of 2026-27, block-duggain, district kathua (using waste plastics length 4.000 kms) length 4.000 km

Construction and maintenance of road from l037-(link road) kohag to kudetar via dallian road rd 6.200 to tumbu package no. jk07-4521, pmgsy-iv, batch-i of 2026-27, block-duggain, district kathua (using waste plastics length 4.000 kms) length 4.000 km

Read more
Improvement of road by way of laying interlocking paver tiles and drain on link road from pmgsy udhampur ghordi road to house of sh. mulkh raj at umalla

Improvement of road by way of laying interlocking paver tiles and drain on link road from pmgsy udhampur ghordi road to house of sh. mulkh raj at umalla

Read more
Improvement and strengthening of link road from lower samnal to pubowal chowk via baliwal km 0/0 to 11/470 sh imp. r/wall, cd,gsb,wmm, tarring work, side drain, cc pavement and road side furniture etc. under deposit industry deptt.

Improvement and strengthening of link road from lower samnal to pubowal chowk via baliwal km 0/0 to 11/470 sh imp. r/wall, cd,gsb,wmm, tarring work, side drain, cc pavement and road side furniture etc. under deposit industry deptt.

Read more
Construction of link road from garnota to pukhru via padwal road km 0-0 to 6-400

( sh- construction of 3.00 mtr span rcc slab culvert at rd 0-795

Read more
Construction of link road to village chuthiyar harizen basti bodh nallah km 0 0 to 0375

Sh construction of 6.00 metre span rcc culvert at rd 0 195 abutment and slab

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise