Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Motor Running Capacitor For Airconditioning Compressor 36 Mfd,Motor Running Capacitor For Aircondit
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5474909 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 05, 2024 21:32 |
| End Date |
Expired
26/10/2024
Expired 701 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreDesign, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read more4 mfd running capacitor,5 mfd running capacitor,6 mfd running capacitor,10 mfd running capacitor,50
Read more
4 mfd running capacitor,5 mfd running capacitor,6 mfd running capacitor,10 mfd running capacitor,50
Read more
2.5 mfd running capacitor,4 mfd running capacitor,5 mfd running capacitor,6 mfd running capacitor,1
Read more
2.5 mfd running capacitor,4 mfd running capacitor,5 mfd running capacitor,6 mfd running capacitor,1
Read more
Capacitor 10 mfd,capacitor 15 mfd,capacitor 25 mfd,capacitor 36 plus minus 6 mfd,capacitor 45 plus
Read more
of your Industry type