Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Block Bearing At Six Nos. Running Belt Conveyor Drum And Replacement Of Bearings At Two Nos Running Belt Conveyor Motors After Dismantling Of Out Of Order Blocks/Bearings From Drums/Motors At 3n4 Incline , J.P.Colly
|
| Description |
Replacement Of Block Bearing At Six Nos. Running Belt Conveyor Drum And Replacement Of Bearings At Two Nos Running Belt Conveyor Motors After Dismantling Of Out Of Order Blocks/Bearings From Drums/Motors At 3n4 Incline , J.P.Colly
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_ECL_297312_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/23-24/77 dated 29.12.2023 |
| Tender Fee | - |
| EMD | 3200 |
| Tender Value | - |
| Place | Online |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | January 02, 2024 16:30 |
| End Date |
Expired
12/01/2024
Expired 1009 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of motors for 200kw conveyor drive units working at pvk-5 incline, kgm area
Procurement of motors for 200kw conveyor drive units working at pvk-5 incline, kgm area
Read moreSupply of spare ht motors for compressor motor chp conveyor belt motors as per boq-tds
Supply of spare ht motors for compressor motor chp conveyor belt motors as per boq-tds
Read moreRepair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Repair and restoration of tail end sliding take-up arrangement including replacement of tail end drums, bearings and bearing block of conveyor 501-b at moonidih coal washery
Read moreRepair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreReplacement of block bearings at different belt conveyor drums after dismantling of out of order blocks bearings from drums at lhcm1 district of 3n4 incline, j.p.colly.
Replacement of block bearings at different belt conveyor drums after dismantling of out of order blocks bearings from drums at lhcm1 district of 3n4 incline, j.p.colly.
Read moreReplacement of fourteen block bearings at six running belt conveyor drums after dismantling the out-of-order blocks and bearings from the drums in the lhcm-1 district of 3n4 incline, j.p. colliery.
Replacement of fourteen block bearings at six running belt conveyor drums after dismantling the out-of-order blocks and bearings from the drums in the lhcm-1 district of 3n4 incline, j.p. colliery.
Read moreStrengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Strengthening of 72l belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly
Read moreStrengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Strengthening of 15xd tandem belt conveyor at lhcm-1, r-viia seam, 3n4 incline, j.p.colly.
Read moreReplacement of two nos. out of order gear coupling and fixed-unit drum at incline 2nd belt conveyor at 3n4 incline, j.p.colly.
Replacement of two nos. out of order gear coupling and fixed-unit drum at incline 2nd belt conveyor at 3n4 incline, j.p.colly.
Read moreof your Industry type