Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Hiring Of Consultancy Firm For Conducting Topographic Survey Geological Investigation Geotechnical Investigation Geo Physical Investigation And Slope Stability Analysis In Nainital City Uttarakhand
|
Description |
Hiring Of Consultancy Firm For Conducting Topographic Survey Geological Investigation Geotechnical Investigation Geo Physical Investigation And Slope Stability Analysis In Nainital City Uttarakhand
|
Organisation | Government of Uttarkhand |
Tender Id | 2023_ULMMC_66429_1 |
Reference Number |
04/ULMMC/RFP/2023 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Dehradun |
Link | https://uktenders.gov.in |
Start Date | December 25, 2023 17:30 |
End Date |
17/01/2024 ( Expired 534 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Geotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026 (2nd call).
Geotechnical sub soil investigation and topographical survey by total station machine in the district of paschim medinipur and jhargram during the year 2025-2026.
Read moreSelection of implementation agency for conducting desktop survey,physical survey,finalization of the route plan,providing gis-integrated im tool etc
Selection of implementation agency for conducting desktop survey, physical survey, finalization of the route plan, providing a gis-integrated inventory management tool, preparation of abd diagram etc. for bharatnet phase-iii project-ner-ii ( arunachal pradesh, nagaland and manipur)
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreConducting preliminary survey detailed survey for the proposed eht line for transmission schemes 230 110kv and preparation of electrical cum civil layout at various places in tlc thanjavur division on running contract basis
Conducting preliminary survey detailed survey for the proposed eht line for transmission schemes 230 110kv and preparation of electrical cum civil layout at various places in tlc thanjavur division on running contract basis
Read moreConsultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Consultancy services for preparation of dpr and land acquisition of gangakhed city bypass 4lane ps configuration road on nh361f connecting to nh361f km at 17.650 to km 33.400 and nh 752k in gangakhed taluka district parbhani in the state of maharas
Read moreConsultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Consultancy services for preparation of dpr and land acquisition of vasmat city bypass road on nh61 connecting to nh61 km 60.00 to km 75.400 in vasmat taluka district hingoli in the state of maharashtra on epc mode. tentative length 17.50 km
Read moreHiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Hiring of services for carrying out pre-engineering survey, rou acquisition and obtaining statutory clearance/ permission for projects in onshore assets under rate contract for a period of 3 years
Read moreIn -situ geotechnical investigation for suitable permanent solution for long term stability of vulnerable stretches of permanent access road to power house complex of pakal dul he project, cvppl, kishtwar,jnk
In -situ geotechnical investigation for suitable permanent solution for long term stability of vulnerable stretches of permanent access road to power house complex of pakal dul he project, cvppl, kishtwar,jnk
Read moreConsultancy service for preparation of feasibility study and detailed project report with land acquisition, forest clearance etc for ring road of city dungarpur in the state of rajasthan (district-dungarpur)
Consultancy service for preparation of feasibility study and detailed project report with land acquisition, forest clearance etc for ring road of city dungarpur in the state of rajasthan (district-dungarpur)
Read moreConsultancy assignment for conducting stability test and certification of stage-ii buildings for statutory compliance of ntpc barh.
Consultancy assignment for conducting stability test and certification of stage-ii buildings for statutory compliance of ntpc barh.
Read moreof your Industry type