Tender Details

Particulars Details
Title
Repairing Of Wornout Link Assly And Wornout Both Side Eye Bush Press Fitting Of Links Of Be 1000 Hydraulic Shovel M/C Sl. No.10232... Of Kuya Ocp.Bastacolla Area Ix
Description
Repairing Of Wornout Link Assly And Wornout Both Side&#X0d Eye Bush Press Fitting Of Links Of Be 1000 Hydraulic Shovel M/C Sl. No.10232... Of&#X0d Kuya Ocp.Bastacolla Area Ix
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2024_BCCL_301651_1
Reference
Number
BCCL/BA-IX/AM (Excvn)/E-Tender/23-24/130
Tender Fee 0
EMD 2434
Tender Value
Place Kuya OCP, Bastacolla Area IX
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344611
Start Date March 13, 2025 21:30
End Date

22/03/2025 ( Expired 50 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Denting, repairing, fabrication of damaged operator cabin including operator seat and machine structural components of zx650h, sl. no. oacg001013 hydraulic shovel of khadia project.

Denting, repairing, fabrication of damaged operator cabin including operator seat and machine structural components of zx650h, sl. no. oacg001013 hydraulic shovel of khadia project.

Read more
Repairing of outer bush seat (housing) of rhs final drive, rhs crawler frame and fitment of fabricated bush (4400099931) in ekg10 cum rope shovel sl. no. 541.

Repairing of outer bush seat (housing) of rhs final drive, rhs crawler frame and fitment of fabricated bush (4400099931) in ekg10 cum rope shovel sl. no. 541.

Read more
Loading, transportation and unloading of ck300d shovel m/c sl. no. b-768/ exc-2940 from dhori area to sirka ocp, argada area. using low bed trailer.

Loading, transportation and unloading of ck300d shovel m/c sl. no. b-768/ exc-2940 from dhori area to sirka ocp, argada area. using low bed trailer.

Read more
Repairing of engine assembly and repairing of steering cylinder both side lhs and rhs of 12xw ace crane sl no mc 648 of purnadih ocp

Repairing of engine assembly and repairing of steering cylinder both side lhs and rhs of 12xw ace crane sl no mc 648 of purnadih ocp

Read more
Repairing of operator cabin assembly, fuel tank assembly, hydraulic oil tank assembly with its mountings along with fitment of cabin glasses of bd155 dozers sl. no. 13718 and 13644 deployed at topa ocp, kuju area.

Repairing of operator cabin assembly, fuel tank assembly, hydraulic oil tank assembly with its mountings along with fitment of cabin glasses of bd155 dozers sl. no. 13718 and 13644 deployed at topa ocp, kuju area.

Read more
Washing, cleaning and repairing of 01 no. failed hydraulic oil cooler of be-1000-1 hydraulic excavator si. no.g-10227 and 01 no. failed hyd. oil cooler of be-1000-1 hydraulic excavator as float at dahibari ocp, cv area.

Washing, cleaning and repairing of 01 no. failed hydraulic oil cooler of be-1000-1 hydraulic excavator si. no.g-10227 and 01 no. failed hyd. oil cooler of be-1000-1 hydraulic excavator as float at dahibari ocp, cv area.

Read more
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.

Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.

Read more
Repairing of window mechanical system and fitting of safety glass of dumper sl. no. d60404, d60407, d60395 and d3637, shovel sl. no. e0169 and dozer sl. no. 13617 and 13719 of sirka ocp.

Repairing of window mechanical system and fitting of safety glass of dumper sl. no. d60404, d60407, d60395 and d3637, shovel sl. no. e0169 and dozer sl. no. 13617 and 13719 of sirka ocp.

Read more
Complete repairing of parent material wornout on bd355 semi u blade structure and reinforcement and strengthen of side frame assy lh and rh of blade arm assembly on 08 nos. beml bd355 dozer sl. no.12073 to 12141.

Complete repairing of parent material wornout on bd355 semi u blade structure and reinforcement and strengthen of side frame assy lh and rh of blade arm assembly on 08 nos. beml bd355 dozer sl. no.12073 to 12141.

Read more
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und

Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise