Tender Details
Particulars | Details |
---|---|
Title |
The Work For Erection Of Line For New Connection On Jhatpat Portal And Nives Mitra Under Ee, Uedd V, Varanasi In Deposit Scheme
|
Description |
The Work For Erection Of Line For New Connection On Jhatpat Portal And Nives Mitra Under Ee, Uedd V, Varanasi In Deposit Scheme
|
Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
Tender Id | 2024_PVVNV_971478_1 |
Reference Number |
28/UEDC-II(V)/2024-25 |
Tender Fee | 3835 |
EMD | 20000 |
Tender Value | |
Place | UEDD-V, VARANASI |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1700415 |
Start Date | November 07, 2024 14:40 |
End Date |
20/11/2024 ( Expired 203 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreKothagudem thermal power station- stage-v (2x250mw)
Supply, erection, testing and commissioning of substation automation system (sas) scheme along with panel for 220kv switchyard having two main buses and one transfer bus with 15 bays 5 spare bays including mandatory spares under psd funds.
Read moreKothagudem thermal power station- stage-v (2x250mw)
Supply, erection, testing and commissioning of numerical bus bar protection relay scheme along with panels for 220kv switchyard having two main buses and one transfer bus with 15 bays 5 spare bays including mandatory spares under psd funds.
Read moreFor surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
For surface cleaning and painting of tower structures with single coat of red oxide and single coat of aluminum paint of 400 kv sarni-seoni line and 400 kv sarni-indirasagar line under tlm sub dn. sarni under ee eht (maint.) dn.itarsi
Read moreIe services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)
Read moreConstruction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipur north) with installation of opgw network on existing line including survey, supply under bn-9018002511
Construction of various transmission elements (02 no. 400 kv and 02 no. 220 kv transmission lines) for proposed 400 kv gss amber (jaipuir north) with installation of opgw network on existing line including survey, supply under bn-9018002511(turnkey)
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreof your Industry type