Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply, Installation, Testing And Commissioning For Ht Extension Work In Various Locations On Full Turnkey Basis In Leh District Under Ut Capex 2024 25.
|
| Description |
Same As Above
|
| Organisation | Power Development and Non-Renewable Energy | State Govt. and UT |
| Tender Id | 2024_PDNRE_13423_1 |
|
Reference Number |
e-NIT No. 22 of ED Leh of 2024-25 dated 18-07-2024 |
| Tender Fee | 2500 |
| EMD | 76000 |
| Tender Value | - |
| Place | Leh |
| Link |
View Original Tender Notice
https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=33675 |
| Start Date | July 19, 2024 15:30 |
| End Date |
Expired
25/07/2024
Expired 791 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Design, manufacture, supply, transportation, erection, testing and commissioning of 60 kl vertical milk storage silo vmst with associated accessories and allied works on turnkey basis at bemul dairy
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreSupply installation testing and commissioning for ht extension works in various locations of leh district shey and saboo section on full turnkey basis under ut capex 2025 26
Same as above
Read moreSupply installation testing and commissioning for ht extension in shey section on full turnkey basis under district capex 2025 26
Same as above
Read moreSupply installation testing and commissioning for ht extension in nubra section on full turnkey basis under district capex 2025 26
Same as above
Read moreSupply installation testing and commissioning for extension of lt line in leh district on full turnkey basis under ssp (ut capex) 2025 26
Same as above
Read moreSupply, installation, testing and commissioning for extension of lt line at various villages/locations of kharu section in leh district under district capex 2023-24 on full turnkey basis
Supply, installation, testing and commissioning for extension of lt line at various villages/locations of kharu section in leh district under district capex 2023-24 on full turnkey basis
Read moreof your Industry type