Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of Damaged 11 Kv Switchgear Under Bp 2023 24 In Edd Ii Gopiganj Bhadohi
|
| Description |
Replacement Of Damaged 11 Kv Switchgear Under Bp 2023 24 In Edd Ii Gopiganj Bhadohi
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_PVVNV_827096_2 |
|
Reference Number |
34/EDC(BH)/2023-24 |
| Tender Fee | 3540 |
| EMD | 11100 |
| Tender Value | - |
| Place | SE EDC BHADOHI |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | October 08, 2023 00:25 |
| End Date |
Expired
20/10/2023
Expired 1086 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreReplacement of damaged 200mm swg line with 300mm at krishna reddy nagar colony lane 2 under cherlapally section, s.d-1, o and m dn.xiv. hmwssb.
Replacement of damaged 200mm swg line with 300mm at krishna reddy nagar colony lane 2 under cherlapally section, s.d-1, o and m dn.xiv. hmwssb.
Read moreReplacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material
Replacement of damaged sludge disposal pipeline from road crossing near additional clarifier along rtps compound wall up to existing pipe rack including supply of required material & as per tender document
Read moreReplacement of damaged 200mm with 200mm swg line from near ration shop, shishumandir school, kushaiguda under cherlapally section, sd.1, under o and m dn.xiv, uppal hmwssb..
Replacement of damaged 200mm with 200mm swg line from near ration shop, shishumandir school, kushaiguda under cherlapally section, sd.1, under o and m dn.xiv, uppal hmwssb..
Read moreConstruction of an rcc drain and replacement of damaged slabs from shambhu sharma's shop (ward no. 21), passing via shubh mangalam marriage hall, up to sohan patel's house.
Construction of an rcc drain and replacement of damaged slabs from shambhu sharma's shop (ward no. 21), passing via shubh mangalam marriage hall, up to sohan patel's house.
Read moreOperation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Operation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Read moreReplacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Replacement of damaged sheeting of godowns 1, 11 and iii nos and providing gi sheet roofing and painting to existing structures at market yard nereducherla under amc., nereducherla of suryapet district.
Read moreReplacement of old aged damaged 200mm dia sewerage line from 2-2-74 to 2-2-42/1 in hanumasai nagar colony under uppal ward, uppal circle under division-4, uppal zone-ii
Replacement of old aged damaged 200mm dia sewerage line from 2-2-74 to 2-2-42/1 in hanumasai nagar colony under uppal ward, uppal circle under division-4, uppal zone-ii
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreReplacement of damaged 11 kv switchgear under bp 2023-24 in edd ii gopiganj bhadohi
Replacement of damaged 11 kv switchgear under bp 2023-24 in edd ii gopiganj bhadohi
Read moreof your Industry type