Tender Details

Particulars Details
Title
Execution Of Electrical (Gen.) Portion Of Work For Construction Of Rub At Km.824/41 43 In Lieu Of Manned Level Crossing No.415 Between Urk Szb Section In Howrah Mumbai Main Line.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79401574
Reference
Number
DyCEE-GSU-R-T-04-24-25
Tender Fee 0
EMD 52300
Tender Value
Place Bilaspur
Link https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79401574/viewNitPdf_4825716.pdf
Start Date January 17, 2025 21:57
End Date

21/02/2025 ( Expired 80 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a / 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj

Construction of re wall of 2 lane r.o.b. in lieu x-ing no.-415 a /&amp#x0d 3e at km 1313/0-1 (shankargarh-nari bari road) of north central railway on naini-manikpur rail section in district prayagraj.

Read more
Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Construction of rob in lieu of l c no 99 at km 247 1 2 of bow string 1x62 rcc girder 2x15m and limited height subway of 1x5x3 m between selu satuna stations on manmad mudkhed section in the state of maharashtra on epc mode

Read more
Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Construction of limited height subway rub near proposed rob at railway km. 576 10 11 lc no c61 on nh89 old nh at ch 165 550 left out portion of nagaur bikaner section in the state of rajasthan on epc mode

Read more
Estimate for earth work in correcting internal section and strengthening of left bank in gyanpur main canal between from km. 34.700 to 59.800 at various reaches

Estimate for earth work in correcting internal section and strengthening of left bank in gyanpur main canal between from km. 34.700 to 59.800 at various reaches

Read more
Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus

Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus

Read more
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Read more
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Read more
Supply of aggregate of 2-lane r.o.b. in lieu of l-xing no. 96c at km 200/16-18 on ambala-saharanpur rail section in between nakur-chilkana road in distt. saharanpur

Supply of aggregate of 2-lane r.o.b. in lieu of l-xing no. 96c at km 200/16-18 on ambala-saharanpur rail section in between nakur-chilkana road in distt. saharanpur

Read more
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross

Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross

Read more
Providing and laying prime coat, tack coat, dbm b.c. etc. work in approach and service road of 2 lane r.o.b. in lieu x-ing no.-60a at km (muradipur-bindki road) of north central railway on pry-cnb section in district fatehpur

Providing and laying prime coat, tack coat, dbm b.c. etc. work in approach and service road of 2 lane r.o.b. in lieu x-ing no.-60a at km (muradipur-bindki road) of north central railway on pry-cnb section in district fatehpur

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise