Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Gnt Division 1)namburu (Gnt Kcc Section): Namburu Road Number 2(up Loop Line) To Be Converted As Common Loop Line Since Favorable Crossovers Exist With Provision Of Sand Hump At Mangalagiri End. Modifications To Ohe
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79353051 |
|
Reference Number |
GNT-E-19-GS-TRD-2024-25 |
| Tender Fee | 0 |
| EMD | 1.62 Lakh |
| Tender Value | |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79353051/viewNitPdf_4823366.pdf |
| Start Date | January 10, 2025 16:38 |
| End Date |
Expired
07/02/2025
Expired 511 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Name of the work :-ohe modification work for dismantling up and dn main line cross over at both ends to eliminate the facility of dn main cum up loop by provision of up loop line as common loop at bishnupur (vsu) station with reception facility from gokulnagar.
For complete deion and other details, please refer to tender
Read more(1) provision/modification of ohe inconnection with - construction of long haul loop line at ghutku by extending the existing de of up loop l/no.-4 at kte end. (2) hrb - development of new goods shed line by extending de of orl of dn loop l/5 towards apr end in dead end form (top wiring ).
For complete deion and other details, please refer to tender
Read moreAlteration in kyosan make electronic interlocking at 03 stations (aubr, pry & grru) in connection with : removal of force layout between crossover 54 a & b(hwh end) through shifting of crossover and up loop as common loop at aubr station, provision of over line in up loop line at pry station & provision of over line in dn loop line at grru station in ddu division.
For complete deion and other details, please refer to tender
Read moreOhe work in connection with segregation of loop line from main line, provision of retro reflective number plate in sbg-kiul and nfk-prdg section with provision of missing bonds in bhw-bksl, bgp-bhle-baka and nfk-prdg sections over malda division.
For complete deion and other details, please refer to tender
Read moreA) timarni - provision of over line on up loop line for making it common loop. b) provision of additional loop line at bir station. c) total fitting renewal under aden/harda section total 29.19 km. (location down road- 569.250-570.040=0.790 km., 580.100-584.000=3.90 km., 635.00-646.11=00 km., up road- 569.250-572.00=2.75 km., 573.00-574.250=1.25 km., 583.00-584.00=1.00 km., 642.00-648.500=6.500 km., 667.00-669.00=2.00 km.)
For complete deion and other details, please refer to tender
Read moreA) timarni - provision of over line on up loop line for making it common loop. b) provision of additional loop line at bir station. c) total fitting renewal under aden/harda section total 29.19 km. (location down road- 569.250-570.040=0.790 km., 580.100-584.000=3.90 km., 635.00-646.11=00 km., up road- 569.250-572.00=2.75 km., 573.00-574.250=1.25 km., 583.00-584.00=1.00 km., 642.00-648.500=6.500 km., 667.00-669.00=2.00 km.)
For complete deion and other details, please refer to tender
Read moreSignal &telecom works (indoor and outdoor) in connection with (i) yard remodeling of anara i.e. provision of 3 new lines (line no.- 7, 8 & 9) and extension of line no.- 2,3 & 4 by shifting of cross over towards bga end to get full csl in dn yard.(ii) dismantling up and dn main line cross over at both ends to eliminate the facility of dn main cum up loop by provision of up loop line as common loop at bishnupur station with reception facility from gokulnagar. and (iii) development o
For complete deion and other details, please refer to tender
Read more[i]ohe modifications for improving the profile and reliability of ohe due to slewing and raising of se in curves in mys-sbc & sbc-dmm section.[ii]ohe modification works due to platform extension at nyh station towards mys end. [iii] ohe modification in connection with construction of pit line 150 mtrs length at rd-01 sgt yard.[iv] ohe modifications related to proposed construction of tower car shed at bid and mya trd depots. [v] provision of auxillary transformer for interlocking of lc&ap
For complete deion and other details, please refer to tender
Read more[i]ohe modifications for improving the profile and reliability of ohe due to slewing and raising of se in curves in mys-sbc & sbc-dmm section.[ii]ohe modification works due to platform extension at nyh station towards mys end. [iii] ohe modification in connection with construction of pit line 150 mtrs length at rd-01 sgt yard.[iv] ohe modifications related to proposed construction of tower car shed at bid and mya trd depots. [v] provision of auxillary transformer for interlocking of lc&ap
For complete deion and other details, please refer to tender
Read moreGuntakal division - 1. sanjamala station - proposed signalling arrangements in connection with provision of railway siding facililties for m/s. ramco cements limited taking off from the yard. 2. timmanacherla station - proposed signalling arrangements in connection with provision of shunting neck towards gy end on down main line side for common loop line (rd-1)
For complete deion and other details, please refer to tender
Read moreof your Industry type