Tender Details

Particulars Details
Title
Cleaning And Maintain The Drain During The Monsoon Period From 4.00 To 8.05 Of K.N.I. Avenue
Description
Cleaning And Maintain The Drain During The Monsoon Period From 4.00 To 8.05 Of K.N.I. Avenue
Organisation Government of West Bengal
Tender Id 2023_WBPWD_556399_3
Reference
Number
WBPWRD/AE/BHS-D/eNIT03/2023-24
Tender Fee
EMD 9336
Tender Value
Place Office of the AE, Baguihati
Link
View Original Tender Notice

https://wbtenders.gov.in

Start Date August 12, 2023 15:30
End Date
Expired 29/08/2023

Expired 1057 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines

Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Cleaning and maintain the drain during the monsoon period from 0.00 kmp. to 4.00 kmp. (airport bound traffic flank side) of k.n.i. avenue

Cleaning and maintain the drain during the monsoon period from 0.00 kmp. to 4.00 kmp. (airport bound traffic flank side) of k.n.i. avenue

Read more
Repairing potholes with shelmac pr on different spot of k.n.i. avenue (ch. 6.1 kmp. to 8.05 kmp.) and vip flyover (both flank) as and when required

Repairing potholes with shelmac pr on different spot of k.n.i. avenue (ch. 6.1 kmp. to 8.05 kmp.) and vip flyover (both flank) as and when required

Read more
Cleaning of rcc drain at siding no. 05 and kutcha drain from biswal chhak to village chhak during monsoon period under anant ocp, ja.

Cleaning of rcc drain at siding no. 05 and kutcha drain from biswal chhak to village chhak during monsoon period under anant ocp, ja.

Read more
Repairing potholes with shelmac pr on different spot of k.n.i. avenue (ch. 6.1 kmp. to 8.05 kmp.) and vip flyover (both flank) as and when required under baguihati highway sub division of barasat highway division no-i

Repairing potholes with shelmac pr on different spot of k.n.i. avenue (ch. 6.1 kmp. to 8.05 kmp.) and vip flyover (both flank) as and when required under baguihati highway sub division of barasat highway division no-i

Read more
Cleaning of drain and maintain the drain by cleaning during monsoon of jessore road at both flank road from 13.700 kmp. to 14.500 kmp.

Cleaning of drain and maintain the drain by cleaning during monsoon of jessore road at both flank road from 13.700 kmp. to 14.500 kmp.

Read more
Cleaning of hume pipes, drains and culverts at kaniha ocp during monsoon period -2024

Cleaning of hume pipes, drains and culverts at kaniha ocp during monsoon period -2024

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise