Particulars | Details |
---|---|
Title |
Capacity Increase Of Distribution Transformers And Installation Of Additional Distribution Transformers Etc. Edd Iii, Ghosi In Additional Business Plan
|
Description |
Capacity Increase Of Distribution Transformers And Installation Of Additional Distribution Transformers Etc. Edd Iii, Ghosi In Additional Business Plan
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_PVVNV_845594_1 |
Reference Number |
61/EDC(M)/2023-24 |
Tender Fee | 3540 |
EMD | 10500 |
Tender Value | |
Place | SE EDC Mau |
Link | https://etender.up.nic.in |
Start Date | October 03, 2023 23:30 |
End Date |
09/10/2023 ( Expired 632 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreCarrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(
Read moreSupply, installation and commissioning of portable ultrasound system for gmch, smch, lmch, dmch, jmch, faamch and tmch in assam
Supply, installation and commissioning of portable ultrasound system for gmch, smch, lmch, dmch, jmch, faamch and tmch in assam&#x0d
Read moreSupply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server
Read moreSupply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf
Read moreRepairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Repairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam
Read moreRepair/maint of transformers and certain b/r repairs ofsub stations in ridge, roulki y station defence colony, ncc offrs mess, mh and raipur satwari under age e/m of ge satwari
Repair/maint of transformers and certain b/r
 repairs of sub stations in ridge, roulki y station
 defence colony, ncc offrs mess, mh and raipur
 satwari under age e/m of ge satwari
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreof your Industry type