Tender Details

Particulars Details
Title
Capacity Increase Of Distribution Transformers And Installation Of Additional Distribution Transformers Etc. Edd Iii, Ghosi In Additional Business Plan
Description
Capacity Increase Of Distribution Transformers And Installation Of Additional Distribution Transformers Etc. Edd Iii, Ghosi In Additional Business Plan
Organisation Government of Uttar Pradesh
Tender Id 2023_PVVNV_845594_1
Reference
Number
61/EDC(M)/2023-24
Tender Fee 3540
EMD 10500
Tender Value
Place SE EDC Mau
Link https://etender.up.nic.in
Start Date October 03, 2023 23:30
End Date

09/10/2023 ( Expired 632 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Supply installation commissioning maintenance of sensors data acquisition data transmission analysis management reporting for the same for bhms for new cable stayed zuari bridge, old zuari bridge on nh-66 and borim bridge on nh-566 in state of goa

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Supply, installation and commissioning of portable ultrasound system for gmch, smch, lmch, dmch, jmch, faamch and tmch in assam

Supply, installation and commissioning of portable ultrasound system for gmch, smch, lmch, dmch, jmch, faamch and tmch in assam&amp#x0d

Read more
Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server

Supply installation implementation training and maintenance of tally software for hmt group of companies in india deployed on a cloud server

Read more
Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Supply, fabrication, assembly and installation of stainless steel equipments in laundry area at wmp, frfcf

Read more
Repairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam

Repairs and maintenance of 11 kv ht cable, switch gear, ring main unit, master relay, metering equipment, 11 kv 0.433kv distribution transformer, compact sub station including re-winding, oil filtering, painting etc and connected work under ge belgam

Read more
Repair/maint of transformers and certain b/r repairs ofsub stations in ridge, roulki y station defence colony, ncc offrs mess, mh and raipur satwari under age e/m of ge satwari

Repair/maint of transformers and certain b/r&#x0d repairs of sub stations in ridge, roulki y station&#x0d defence colony, ncc offrs mess, mh and raipur&#x0d satwari under age e/m of ge satwari

Read more
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise