Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Cooling Coil,Pump Bearing Bush,Intermediate Bearing Bush,Cooling Coil,Thrust Pads 1 Set Is Equal To
|
Description |
|
Organisation | Department of Atomic Energy | PMO |
Tender Id | GEM/2025/B/6238793 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | May 22, 2025 14:57 |
End Date |
12/06/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreE-tender notice for printing and supplying the set of svarabitan (vol. 1 to 66) and sanchayita (board binding) on unit cost basis with paper
E-tender notice for printing and supplying the set of svarabitan (vol. 1 to 66) and
 sanchayita (board binding) on unit cost basis with paper
Read moreAutomatic voltage regulator for gen set,transformer gen set,coil assy for gen set,bearing for gen s
Read more
Ca no. ge af no.1-gur-36-2025-26 comprehensive maintence to br works along with minor repair in 27ed and 31mcu at af stn palam and repair of dg set, perimeter security light, street light, tech area at 27 ed and 31 mcu at stn palam under ge af gurga
Ca no. ge af no.1-gur-36-2025-26 comprehensive maintence to br works along with minor repair in 27ed and 31mcu at af stn palam and repair of dg set, perimeter security light, street light, tech area at 27 ed and 31 mcu at stn palam under ge af gurga
Read more4st relay,suspension bush kit,bendix drive,cord set high tension,s a of relay valve,spider bearing,
Read more
Wiper motor,oil pump assy,king pin bush,kind pin bearing,front wheel bearing,door lock handle,three
Read more
Bush centering,set screw,sun gear shaft,shaft seal,flange input,output flange,intermediate prop sha
Read more
Provn of earthing pit infrastructure at 4 brd, provn of dg set for p-1 bldg, provn of deficient acs against ber, provn of electric supply to arrestor barrier and other certain location at tech area at afs kanpur
Provn of earthing pit infrastructure at 4 brd, provn of dg set for p-1 bldg, provn of deficient acs against ber, provn of electric supply to arrestor barrier and other certain location at tech area at afs kanpur
Read moreof your Industry type