Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reconstruction Work Of Damaged Secen Work On Sanija Bawdi To Kheda Road
|
| Description |
Reconstruction Work Of Damaged Secen Work On Sanija Bawdi To Kheda Road
|
| Organisation | Government of Rajasthan |
| Tender Id | 2023_CEPWD_349905_6 |
|
Reference Number |
EE PWD DIV SULTANPUR NITNO-10-2023-24 |
| Tender Fee | 500 |
| EMD | 17000 |
| Tender Value | |
| Place | EE PWD DV SULTANPUR |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in |
| Start Date | July 11, 2023 20:15 |
| End Date |
Expired
18/07/2023
Expired 1072 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Reconstruction of damaged boundary wall facing seaside at 7m detachment okha under ge (navy) porbandar
Reconstruction of damaged boundary wall facing seaside at 7m detachment okha under ge (navy) porbandar 
Read moreRe-construction of damaged footpath and kerbs on v-4 road in sector 37 chandigarh.
Re-construction of damaged footpath and kerbs on v-4 road in sector 37 chandigarh.
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreConstruciton of fenching work on court road in ward no. 55
Construciton of fenching work on court road in ward no. 55
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreFor replacement of damaged conductors of r and y ph between tower no 19i and 19ii on 220 kv rewa road sirathu transmission line
For replacement of damaged conductors of r and y ph between tower no 19i and 19ii on 220 kv rewa road sirathu transmission line
Read moreRepair work on the guaranteed road, tisaya koyala, baran
Repair work on the guaranteed road, tisaya koyala, baran
Read moreRoad protection work on pahara rudayan odr road in fy 2026-27
Road protection work on pahara rudayan odr road in fy 2026-27
Read moreConstruction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Construction and maintenance of 3 roads 1 construction of amli approach raod to amali usara faliya rd 2 chharchhoda patel faliya road to chharchhoda kheda faliya rd 3 dahod jesavada dhanpur road to chharchhoda talav faliya rd at garbada dahod
Read moreof your Industry type