Tender Details
Particulars | Details |
---|---|
Title |
Deposit Restoration Work Kurupampadykootikal Via Vavely From Ch 0 700 1 250 Restoration Work For Road Cutting By Kwa Retender
|
Description |
This Estimate Is Prepared For Kuruppampady&Amp#X0d
Koottickal Via Vavely Road As A Restoration Work&Amp#X0d
For Rectifying The Dagaes Caused To The Road Due&Amp#X0d
To Road Cutting By Kerala Water Authority
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWD_663818_1 |
Reference Number |
PWD/RB/TR/22118/2023_5_1_1/1 |
Tender Fee | 2760 |
EMD | 45726 |
Tender Value | |
Place | Ernakulam |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1054121 |
Start Date | June 26, 2024 23:30 |
End Date |
03/07/2024 ( Expired 345 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 lada to bameng 0 000 to 43 65 43 65 km
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read more628/p-1/emp-12877 dated 12.06.25
To procure two numbers multipurpose fire tenders with tata motors make chassis from fabricator for fire fighting services at ggsstp, rupnagar as under -&#x0d a) two no. chassis ( model- ultra t.19 tata motors make) are to be procured by fabricator.&#x0d
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreIndependent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.
Read moreConstruction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreConstruction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Read moreof your Industry type