Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Short Term Road Safety Measures At Morth Identified Blackspots Locations Based On Accident Data Of 2019 21 Of Hyderabad Vijayawada Section Of Nh 65 (Old Nh 9) From Km.40.000 To 221.500 In The States Of Telangana And Andhra Pradesh.
|
| Description |
Providing Short Term Road Safety Measures At Morth Identified Blackspots Locations Based On Accident Data Of 2019 21 Of Hyderabad Vijayawada Section Of Nh 65 (Old Nh 9) From Km.40.000 To 221.500 In The States Of Telangana And Andhra Pradesh.
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_233137_1 |
|
Reference Number |
NHAI/PIU-HYD/NH-65/HYD-VIJ/ BS-2019-21/2025 |
| Tender Fee | 25000 |
| EMD | 1.89 Lakh |
| Tender Value | - |
| Place | Hyderabad-Vijayawada section of NH-65 |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=263697 |
| Start Date | April 19, 2025 20:30 |
| End Date |
Expired
19/05/2025
Expired 514 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Sr (special repair) work of permanent rectification of blackspots including street lights on nh-52/11
Sr (special repair) work of permanent rectification of blackspots including street lights on nh-52/11
Read moreRectification of 2 nos.of blackspots at akkammagarla temple crossing road ap (03) 248 and kld circle road ap (04) 200 on nh 544dd in the state of andhra pradesh
Rectification of 2 nos.of blackspots at akkammagarla temple crossing road ap (03) 248 and kld circle road ap (04) 200 on nh 544dd in the state of andhra pradesh
Read moreSr work drainage work netadiya, gawardi, chakdhani and lampolai in ajmer nagour section of nh-89(ii) temporary road safety measures at tilora, thanwla, padukalan, merta, ren,bhadana, mundwa etc. in ajmer nagour section of nh-89
Sr work drainage work netadiya, gawardi, chakdhani and lampolai in ajmer nagour section of nh-89(ii) temporary road safety measures at tilora, thanwla, padukalan, merta, ren,bhadana, mundwa etc. in ajmer nagour section of nh-89
Read moreConstruction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreImprovement of junction, installation of street light/high mast light, construction of road side drainage etc. on accident prone locations of nh-162e km 0/000 to 88/800
Improvement of junction, installation of street light/high mast light, construction of road side drainage etc. on accident prone locations of nh-162e km 0/000 to 88/800
Read moreConstruction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
Construction of iconic hybrid cable stayed and suspension bridge across krishna river on nh -167k (design chainage km 87.360 to km 88.437) in the states of telangana and andhra pradesh on engineering, procurement and construction (epc) basis
Read moreLong term rectification of the morth identified 03 nos of blackspots at ashrafpur and jiyanpur and at latghat on nh 128c in the state of uttar pradesh
Long term rectification of the morth identified 03 nos of blackspots at ashrafpur and jiyanpur and at latghat on nh 128c in the state of uttar pradesh
Read moreImprovement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Improvement of morth identified blackspots through construction of grade separators at selected locations along nh 75 corridor bw km.216.91 to km.302.42 with an effective improvement length 25.6 km under nh(o) on epc mode in the state of karnataka
Read moreConstruction of 4 no underpasses comprising 2 no vups and 2 lvups at identified blackspot/ accident prone locations of angul sambalpur of nh 55 in the state of odisha
Construction of 4 no underpasses comprising 2 no vups and 2 lvups at identified blackspot/ accident prone locations of angul sambalpur of nh 55 in the state of odisha
Read moreSix-laning of hyderabad-vijayawada section of nh-65 section ch.39.85 to ch.221.15 (181.30 km) (pkg-1) in the states of telangana and andhra pradesh under bot mode
Six-laning of hyderabad-vijayawada section of nh-65 section ch.39.85 to ch.221.15 (181.30 km) (pkg-1) in the states of telangana and andhra pradesh under bot mode
Read moreof your Industry type