Title
Taking Out Temporary Shed Of Canteen From Mine No.3 And Re Fixing The Same At Adasa Ug To Oc Mine Of Saoner Sub Area.
Description
Taking Out Temporary Shed Of Canteen From Mine No.3 And Re Fixing The Same At Adasa Ug To Oc Mine Of Saoner Sub Area.
Organisation Western Coalfields Limited | Public Sector Undertakings
Tender Id 2024_WCL_322427_1
Reference
Number
na3259-Civ-e-tender 06 -2024-25
Tender Fee 0
EMD 2200
Tender Value -
Place Mine No.3 and Adasa UG to OC
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334218

Start Date December 03, 2024 17:30
End Date
Expired 12/12/2024

Expired 675 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Custom bid for services - work of dismantling and reinstallation of 21 meter communication tower and ptz camera along with radio unit at adasa ug to oc mine saoner sub area nagpur area

Custom bid for services - work of dismantling and reinstallation of 21 meter communication tower and ptz camera along with radio unit at adasa ug to oc mine saoner sub area nagpur area

Read more
Custom bid for services - repairing of belt conveyor system of 0l 3 30d 11l 1 11l 2nd and 59r installed at saoner ug mine no 3 nagpur area wcl

Custom bid for services - repairing of belt conveyor system of 0l 3 30d 11l 1 11l 2nd and 59r installed at saoner ug mine no 3 nagpur area wcl

Read more
Custom bid for services - loading & transportation of 150 mtrs belt conveyor 330 mtrs belt conveyor 1000mm belt drivehead from surface and unloading, transportation & installation of same at 35le by 54 by 55 re seam v at saoner mine no 1 of saone..

Custom bid for services - loading & transportation of 150 mtrs belt conveyor 330 mtrs belt conveyor 1000mm belt drivehead from surface and unloading, transportation & installation of same at 35le by 54 by 55 re seam v at saoner mine no 1 of saone..

Read more
Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla

Taking down dismantling and testing of fuel injector including necessary replacement of protection sleaves nossil and reinstallation the same complete,taking down checking of wheels break system greasing road spring and replacement of the following worn out parts,tensioning of road spring and welding leaf clamp,grease,centre bolt,road spring,complete back break assembly disc,opening radiator complete assembly checking testing soldering and refixing in same with following works,hose pipe set,water ,chemically cleaning of radiator, soldering.,radiator foundation pad,fan belt,temperature gauge,repair replacement of miscelleneous accessories,rear door glass operation handle,front door glass operation handle,rear rh tail board light,dismantaling of head light adjustment and focusing of light beam refixing the same after repair service,side indicator rear,side foot rest of both side,foot mat,steering cover,gear leaver cover,dismantling of clutch assy with the following unsv parts replace and refitted,clutch pla

Read more
Temporary arrangement of cabin for new weighbridge platform at adasa ug to oc mine of saoner sub area.

Temporary arrangement of cabin for new weighbridge platform at adasa ug to oc mine of saoner sub area.

Read more
Strengthening of 100mt weighbridge at adasa ug to oc mine of saoner sub area.

Strengthening of 100mt weighbridge at adasa ug to oc mine of saoner sub area.

Read more
Construction of project managers office at adasa ug to oc mine of saoner sub area.

Construction of project managers office at adasa ug to oc mine of saoner sub area.

Read more
Construction of 02nos. of sedimentation tank at adasa ug to oc mine of saoner sub area.

Construction of 02nos. of sedimentation tank at adasa ug to oc mine of saoner sub area.

Read more
Construction of e and m workshop and engineer office at adasa ug to oc mine of saoner sub area.

Construction of e and m workshop and engineer office at adasa ug to oc mine of saoner sub area.

Read more
Providing and fixing collapsible gate at newely constructed managers office at adasa ug to oc mine of saoner sub area.

Providing and fixing collapsible gate at newely constructed managers office at adasa ug to oc mine of saoner sub area.

Read more