Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Water Line At Pr.No.2 Sanmitr Nagar And Mahesh Thobade Nagar
|
Description |
Providing And Laying Water Line At Pr.No.2 Sanmitr Nagar And Mahesh Thobade Nagar
|
Organisation | Solapur Municipal Corporation | State Govt. and UT |
Tender Id | 2025_SMC_1179172_1 |
Reference Number |
PHE/CW/168-2024-25 |
Tender Fee | 1100 |
EMD | 8760 |
Tender Value | |
Place | Solapur |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2047396 |
Start Date | May 10, 2025 22:50 |
End Date |
19/05/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Jp/b862-204-pd-t-8701/1016 - water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreProcurement of 06 numbers of grinding ring and 216 numbers of ball of el-76 pulveriser at unit-2, btps.
Procurement of 06 numbers of grinding ring and 216 numbers of ball of el-76 pulveriser at unit-2, btps.
Read moreTender document for laying of underground pe pipelines & last mile connectivity (lmc) works at gomati & west tripura ga s (2 years arc)
Tender document for laying of underground pe pipelines & last mile connectivity (lmc) works at gomati & west tripura ga s (2 years arc)
Read moreProviding installation and commissioning of air conditioning system at bbmb auditorium (near d.a.v school) at nangal township
Providing installation and commissioning of air conditioning system at bbmb auditorium (near d.a.v school) at nangal township
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreProviding office facilities for customs, cisf and vpa staff at newly constructed rfid gates in port area
Providing office facilities for customs, cisf and vpa staff at newly constructed rfid gates in port area
Read moreRemodeling of lift irrigation scheme patta brawary in gp brawary tehsil and distt solan sh construction of percolation well providing laying jointing testing and commissioning of rising main of gi pipe medium grade 150 mm dia conforming to bis 1239
Remodeling of lift irrigation scheme patta brawary in gp brawary tehsil and distt solan sh construction of percolation well providing laying jointing testing and commissioning of rising main of gi pipe medium grade 150 mm dia conforming to bis 1239
Read moreConstruction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Construction of new 2lane major bridge and its approaches between 2 existing bridge at palasuni over gangua nallah (km 3.897) on nh 16 in the state of odisha on epc mode
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreof your Industry type