Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Providing Hoisting And Fixing Above Plinth Level Up To Floor Five Level Precast Reinforced Cement C
|
| Description |
|
| Organisation | Department of Higher Education | Ministry of Education |
| Tender Id | GEM/2024/B/5590764 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | November 09, 2024 17:27 |
| End Date |
Expired
30/11/2024
Expired 684 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Precast reinforced cement concrete line drain 650mm x 450mm and 1 mtr length
Precast reinforced cement concrete line drain 650mm x 450mm and 1 mtr length
Read moreProviding and fixing reinforced cement concrte crash barrier from entry gate to culvert at nvm safidon
Providing and fixing reinforced cement concrte crash barrier from entry gate to culvert at nvm safidon
Read more( ward samiti nidhi) providing and fixing precast concrete reinforced banch 3 seater in differente place. ward 19. zone 08 file no. 102/26x3/3. 2nd call
( ward samiti nidhi) providing and fixing precast concrete reinforced banch 3 seater in differente place. ward 19. zone 08 file no. 102/26x3/3. 2nd call
Read moreDismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Read moreDismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Dismantling old plaster,dismantling tile work,supplying and fixing movable,providing and applying gypsum-based punning,providing and applying white cement,providing and applying priming,wall painting with acrylic,providing and laying ceramic glazed floor tiles,providing and laying in position cement concrete,dismantling and removing existing wooden flooring,providing and fixing wooden sub-base floor,providing and fixing 4.5 mm thick pvc vinyl flooring,supplying and fixing movable badminton posts
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreRemoving dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Removing dry or oil bound distemper, water proofing cement paint,providing and fixing ppr unions 25 mm,providing and placing on terrace at all floor levels polyethylene water storage tank,providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index of 105 on top of concrete roof,providing and fixing 19 mm thick both side balancing lamination factory pressed bwp grade marine ply,removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs,providing and applying white cement based putty of average thickness 1 mm,wiring for circuit or submain wiring along with earth wire
Read moreEarth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Earth work in excavation by mechanical means,filling available excavated earth ,excluding rock,,providing and laying in position cement concrete,providing and laying in position specified grade of reinforced cement concrete,steel reinforcement for rcc work including straightening,brick work with common burnt clay fps ,non modular, bricks,brick work with common burnt clay fps ,non modular, bricks,cement plaster 12 mm,providing and laying vitrified tiles in different sizes,providing and fixing 1st quality ceramic glazed wall tiles,providing and fixing factory made upvc , powder coated steel door frames,wall painting with premium acrylic emulsion paint of interior grade,finishing walls with acrylic smooth exterior paint,synthetic enamel paint,,constructing brick masonry septic tank of suitable capacity plaster,providing and fixing white vitreous china pedestal type , orissa pattern,providing and fixing white vitreous china flat back half stall urinal,providing and fixing wash basin with ci brackets,providing and
Read moreSite preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Site preparation and setting out,foundation rcc structural work,9 inch avval brick masonry,cement sand quality control,plastering,interior paint system,exterior paint system,decorative sports wall dado,structural steel roof frame,metal roofing,two layer high level ventilation,commercial exhaust system,badminton sports floor vinyl matting,net and umpire equipment,seating for badminton court,changing rooms,score board system,water dispensers,electrical distribution work,badminton lighting,display av provision,fire life safety,doors architectural work,plumbing drainage work
Read moreDismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Dismantl pcc,dismantl brick mason,dismantl rcc,excv less than 3 ord dis out,wet mix macadam,s and f coarse sand,pcc plin 1 is to 1.5 is to 3 cs,brk msn pl cs cl50,plaster 18mm cs 1 is to 5,neat cement punning,rcc design mix m25,sfe str stl manual,steel reinforcement,precast rcc,hume pipe np3 600mm,bld pnt cmt prim 2c,bld pnt exterior,bld pop putty,bib cock,urinal china 430x260,soap tray,towel ring,pvc exhaust fan 12 inch,ceiling fan 48 inch,soak pit,hdpe water tk 1000l,pcc plin 1 is to 3 is to 6 cs,hf brk ab pl cs c75,stone raise pointing,plaster 12mm cs 1 is to 5,plaster 6mm cs 1 is to 4,ceramic tiles 5mm,vitrified 600x600x10,upvc waste pip 100nb,hdpe pipe conceal 20,hdpe pipe conceal 25,hdpe water tk 500l,brass ball vlv 25nb,mirror 6mm polished,towel rail,wash basin 450x300mm,soap container,wc indian,urinal china 580x380,floor trap 100mm opn,stop cock 20nb,wood door nondeco 35,louver glass powder,septic tank 100 pers,ss 304 grade railing
Read moreof your Industry type