Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ttps Operation Circle Cad Cleaning Removing And Transporting The Sludges, Sediments And Cleaning Of Pressure Sand Filter And Oxidation Channel Treated Water Sump And Return Sludges To Well Sump In Sewage Water Treatment Plant
|
| Description |
Ttps Operation Circle Cad Cleaning Removing And Transporting The Sludges, Sediments And Cleaning Of Pressure Sand Filter And Oxidation Channel Treated Water Sump And Return Sludges To Well Sump In Sewage Water Treatment Plant
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_346382_1 |
|
Reference Number |
SE/O/TTPS/Spec.No.137/23-24 |
| Tender Fee | 0 |
| EMD | 2400 |
| Tender Value | - |
| Place | O/o SE/O/TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | July 19, 2023 19:30 |
| End Date |
Expired
02/08/2023
Expired 1171 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Read moreTtps operation circle cad acwph unit i ii cleaning painting of bearing cooling water supply return header line from acwph to mill plant of unit i ii area
Ttps operation circle cad acwph unit i ii cleaning painting of bearing cooling water supply return header line from acwph to mill plant of unit i ii area
Read moreTtps operation circle cad acwph unit ii cooling tower dismantling and replacement of worn out punctured 80 nb ms tapping spool pipe in bearing cooling water return hot water line
Ttps operation circle cad acwph unit ii cooling tower dismantling and replacement of worn out punctured 80 nb ms tapping spool pipe in bearing cooling water return hot water line
Read moreTtps operation circle cad acwph unit iii dismantling and replacement of wornout, punctured and damaged 600 nb return header pipe line of unit iii acw system in acwph i trough area
Ttps operation circle cad acwph unit iii dismantling and replacement of wornout, punctured and damaged 600 nb return header pipe line of unit iii acw system in acwph i trough area
Read moreTtps operation circle cad acwph unit i dismantling and re-erection of 400 nb bearing cooling water return line at tail end near unit i cooling tower and patch up welding of punctured 600 nb bearing cooling water return line, near unit i
Ttps operation circle cad acwph unit i dismantling and re-erection of 400 nb bearing cooling water return line at tail end near unit i cooling tower and patch up welding of punctured 600 nb bearing cooling water return line, near unit i
Read moreTtps operation circle cad dismantling of worn out earth flats and providing new earth flats and earth pipes in ldo unloading point and sump pump area of fuel oil pump house
Ttps operation circle cad dismantling of worn out earth flats and providing new earth flats and earth pipes in ldo unloading point and sump pump area of fuel oil pump house
Read moreTtps operation circle cad acwph unit ii dismantling and erection of damaged and punctured 80 nb ms tapping spool pipes 9 nos. at bearing cooling hot water return line in cooling tower of unit ii
Ttps operation circle cad acwph unit ii dismantling and erection of damaged and punctured 80 nb ms tapping spool pipes 9 nos. at bearing cooling hot water return line in cooling tower of unit ii
Read moreTtps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water return header 600 nb ms pipe line of unit i acw system near repair bay area
Ttps operation circle cad acwph unit i annual overhauling dismantling and renewal of worn out and punctured pipes of bearing cooling water return header 600 nb ms pipe line of unit i acw system near repair bay area
Read moreTtps operation circle cad foph attending prive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and storage tanks heavy oil ioc pumping lines and supply lines
Ttps operation circle cad foph attending prive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and storage tanks heavy oil ioc pumping lines and supply lines
Read moreTtps operation circle cad foph attending prive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and storage tanks heavy oil ioc pumping lines and supply lines of
Ttps operation circle cad foph attending prive maintenance of fuel oil pump house equipments and line patrolling and removing the inflammable materials in and around pipe lines and storage tanks heavy oil ioc pumping lines and supply lines of
Read moreof your Industry type