Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Wbm Road Construction Project 🛣️ Eastern Coalfields Limited (Ecil), A Public Sector Undertaking, Is Seeking Bids From Experienced Contractors For The Construction Of A Wbm (Water Bound Macadam) Road From Ob Dump No 7 (Near Trs) To The Bhaluka Site Within The Sonepur Bazari Area. 📅 Bid Submission Deadline: April 24, 2024, 5:00 Pm A Tender Security Amounting To Inr 13,08,000/ Is Required At The Time Of Bid Submission. Interested Bidders Should Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, In Accordance With The Project's Requirements And Relevant Construction Standards. Keywords: Construction, Wbm Road, Eastern Coalfields Limited, Public Sector Undertaking, Road Infrastructure, Tender, Bid Submission, Sonepur Bazari Area| Particulars | Details |
|---|---|
| Title |
Construction Of Wbm Road From Ob Dump No 7 (Near Trs) To Bhaluka Site Under S B Area
|
| Description |
Construction Of Wbm Road From Ob Dump No 7 (Near Trs) To Bhaluka Site Under S B Area
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_306359_1 |
|
Reference Number |
ECL/HQ/GM(C)/ e-Tender/24-25/01 Date 06.04.2024 |
| Tender Fee | 0 |
| EMD | 13.08 Lakh |
| Tender Value | - |
| Place | Sonepur Bazari Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=317461 |
| Start Date | April 09, 2024 17:30 |
| End Date |
Expired
24/04/2024
Expired 901 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreImprovement of road from high tension double road to swd way to dr.chandraraje urs house and site no 118 to site no 127 near annapurneshwari temple at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Improvement of road from high tension double road to swd way to dr.chandraraje urs house and site no 118 to site no 127 near annapurneshwari temple at vijayanagara 4th stage 2nd phase in hootagalli cmc limit
Read moreService charges for online calibration of apex 150 abt energy meters lt energy meters of ktpp stagei stageii at ktpp site
Service charges for online calibration of apex 150 abt energy meters lt energy meters of ktpp stagei stageii at ktpp site
Read moreDevelopment of new a site retail outlet (ro) at tsrtc, shabad village and mandal, rangareddy district, telangana under secunderabad divisional office of tapso
Development of new a site retail outlet (ro) at tsrtc, shabad village and mandal, rangareddy district, telangana under secunderabad divisional office of tapso
Read moreImprovement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit
Improvement of road from high-tension double road to site number 10712 through mahadeshwara provision store at vijayanagara 4th stage, 2nd phase in hootagalli cmc limit
Read moreSupply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Supply, installation, testing, commissioning and demonstration of survey rover receiver and controller with gnss field survey software and accessories, including three years on site warranty and training
Read moreof your Industry type