Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Restoring Spur Rd 31800 Damaged During Floods Of 2023, Using Boulder Stone And Bringing Shank Portion Of Spur To Design Section, Alongwith Providing X Stud At Nose To Save Harike D/S Embankment And Nearby Abas On R/S Of River Sut
|
| Description |
Estimate For Restoring Spur Rd 31800 Damaged During Floods Of 2023, Using Boulder Stone And Bringing Shank Portion Of Spur To Design Section, Alongwith Providing X Stud At Nose To Save Harike D/S Embankment And Nearby Abas On R/S Of River Sut
|
| Organisation | Department of Water Resources | State Govt. and UT |
| Tender Id | 2024_WR_131979_1 |
|
Reference Number |
Estimate for restoring spur RD 31800 damaged during floods of 2023, using boulder stone and bringin |
| Tender Fee | 6900 |
| EMD | 1.4 Lakh |
| Tender Value | - |
| Place | XEN,TarnTaran Drg.Cum Mining Division, TarnTaran |
| Link |
View Original Tender Notice
https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=269231 |
| Start Date | January 11, 2025 19:30 |
| End Date |
Expired
20/01/2025
Expired 591 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Estimate for restoring spur rd 31200 damaged during floods of 2023, using boulder stone and bringing shank portion of spur to design section, alongwith providing x-stud at nose to save harike d/s embankment and nearby abas on r/s of river sut
Estimate for restoring spur rd 31200 damaged during floods of 2023, using boulder stone and bringing shank portion of spur to design section, alongwith providing x-stud at nose to save harike d/s embankment and nearby abas on r/s of river sut
Read moreEstimate for restoring spur rd 33800 and 35300 damaged during floods of 2023, using boulder stone and bringing shank portion of spur to design section , to save harike d/s embankment and near by abas on r/s of river sutlej.
Estimate for restoring spur rd 33800 and 35300 damaged during floods of 2023, using boulder stone and bringing shank portion of spur to design section , to save harike d/s embankment and near by abas on r/s of river sutlej.
Read moreEstimate for restoring spur rd 31800 damaged during floods of 2023 and providing x-stud at nose d/s to save c- land and village abas r/s of river sutlej
Estimate for restoring spur rd 31800 damaged during floods of 2023 and providing x-stud at nose d/s to save c- land and village abas r/s of river sutlej
Read moreEstimate for restoring spur rd 33500-35000 damaged during floods 2023 to save c- land and village abas r/s of river sutlej
Estimate for restoring spur rd 33500-35000 damaged during floods 2023 to save c- land and village abas r/s of river sutlej
Read moreEstimate for restoring spur rd 31200 damaged during floods of 2023 and providing x-stud at nose d/s to save c land and village abas r/s of river sutlej
Estimate for restoring spur rd 31200 damaged during floods of 2023 and providing x-stud at nose d/s to save c land and village abas r/s of river sutlej
Read moreRestoring apron spur rd 2000 damaged during flood season 2023 on earthen bundh to save village abas and c-land on left side of river ravi.
Restoring apron spur rd 2000 damaged during flood season 2023 on earthen bundh to save village abas and c-land on left side of river ravi.
Read moreRestoring apron spur rd 15500 damaged during flood season 2023 on earthen bundh to save bop shahpur, village abas and c-land on left side of river ravi.
Restoring apron spur rd 15500 damaged during flood season 2023 on earthen bundh to save bop shahpur, village abas and c-land on left side of river ravi.
Read moreProviding 600 ft. revetment in between of spur rd 31200 to 31800 for safety of harike d/s bundh at right side of sutlej river
Providing 600 ft. revetment in between of spur rd 31200 to 31800 for safety of harike d/s bundh at right side of sutlej river
Read moreConstruction of boulder stone revetment on right side of river ghaggar at vill badshapur to save nearby agricultural land before floods of 2025
Construction of boulder stone revetment on right side of river ghaggar at vill badshapur to save nearby agricultural land before floods of 2025
Read moreStrengthening of bund using boulder stone at rd 17000 of bassian jhampur downstream left side near village pawala to save abas and agriculture land
Strengthening of bund using boulder stone at rd 17000 of bassian jhampur downstream left side near village pawala to save abas and agriculture land
Read moreof your Industry type