Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply And Installation Of V Fans And Gi Is Ducting System At Different Tunnels At Chp Ktps Through Capex 2025 26
|
| Description |
Supply And Installation Of V Fans And Gi Is Ducting System At Different Tunnels At Chp Ktps Through Capex 2025 26
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_874731_1 |
|
Reference Number |
GM(K)/CC/CHPM/3736/E3451/25-26 |
| Tender Fee | 0 |
| EMD | 51662 |
| Tender Value | - |
| Place | Tender Opening Halll, GM bldg, KTPS,Mecheda, |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1969172 |
| Start Date | July 23, 2025 19:30 |
| End Date |
Expired
09/08/2025
Expired 430 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco - ktps-vii stage - chp - em and(c and i) - procurement of various end termination and straight through joint kits for ht cables - quotation called for -regarding.
Tggenco - ktps-vii stage - chp - em and(c and i) - procurement of various end termination and straight through joint kits for ht cables - quotation called for -regarding.
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreSupply and installation of seven 07 nos new ventilation fan with motor along with new g i duct in different tunnels at chp ktps through capex fy 2024 25
Supply and installation of seven 07 nos new ventilation fan with motor along with new g i duct in different tunnels at chp ktps through capex fy 2024 25
Read moreSlew bearing replacement job of s r 3 of chp ktps through capex 23 24
Slew bearing replacement job of s r 3 of chp ktps through capex 23 24
Read moreSlew bearing replacement job of s r 3 of chp ktps through capex 23 24
Slew bearing replacement job of s r 3 of chp ktps through capex 23 24
Read moreProcurement of 560kw,6.6kv motor for crusher1,2 under chp-em, ktps through capex 2025-26
Procurement of 560kw,6.6kv motor for crusher1,2 under chp-em, ktps through capex 2025-26
Read moreProcurement of live frame for vibrating screens under chp-mm, ktps through capex - 2025-26.
Procurement of live frame for vibrating screens under chp-mm, ktps through capex - 2025-26.
Read moreProcurement of dust extraction system for bunker floor, stage-2 of chp under chp-mm, ktps through capex 2024-25
Procurement of dust extraction system for bunker floor, stage-2 of chp under chp-mm, ktps through capex&#x0d 2024-25
Read moreof your Industry type