Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛠️ Yantra India Limited Rfp For Factory Repairs And Renovations 🛠️ Yantra India Limited, A Public Sector Undertaking, Is Seeking Contractors For A Percentage Rate Contract To Undertake Repairs And Renovations Of Various Infrastructure Components Within The Ordnance Factory Ambajhari, Nagpur. 🏭 📅 Submission Deadline: May 14, 2024, 2:00 Pm The Scope Of Work Includes The Repair, Renovation, And Strengthening Of Existing Sheds, Floors, Cable Trenches, Covers, Drainage Systems, And Machine Foundations, Along With Minor Civil Works. Interested Contractors Must Submit An Earnest Money Deposit (Emd) Of Inr 30,000/ With Their Bids. Keywords: Yantra India Limited, Minor Civil Works, Factory Repairs, Renovation, Infrastructure, Psu, Rfp, Emd, Ordnance Factory Ambajhari, Nagpur| Particulars | Details |
|---|---|
| Title |
Percentage Rate Contract For Repairs, Renovation Of Existing Sheds, Floors, Cable Trenches And Covers, Drainage System, Strengthening Of Machine Foundation, Minor Civil Works Inside The Factory At Ofaj
|
| Description |
Percentage Rate Contract For Repairs, Renovation Of Existing Sheds, Floors, Cable Trenches And Covers, Drainage System, Strengthening Of Machine Foundation, Minor Civil Works Inside The Factory At Ofaj
|
| Organisation | Yantra India Limited | Public Sector Undertakings |
| Tender Id | 2024_YIL_193956_1 |
|
Reference Number |
9905/06/RD2307/PRC/EOCivil/24 |
| Tender Fee | 0 |
| EMD | 30000 |
| Tender Value | - |
| Place | Ordnance Factory Ambajhari, Nagpur |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=212363 |
| Start Date | April 23, 2024 18:00 |
| End Date |
Expired
14/05/2024
Expired 888 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Percentage rate contract for the electrical works inside the factory at ofd
Percentage rate contract for the electrical works inside the factory at ofd.
Read morePercentage rate contract on mes ssr 2020 regarding repair and regular maintenance work in production building and its surrounding area inside factory at vfj
Percentage rate contract on mes ssr 2020 regarding repair and regular maintenance work in production building and its surrounding area inside factory at vfj
Read moreSurface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read morePercentage rate contract for repairs, renovation of existing sheds, floors, cable trenches and covers, drainage system, water supply line, strengthening of machine foundation, minor civil works inside the factory at ofaj.
Percentage rate contract for repairs, renovation of existing sheds, floors, cable trenches and covers, drainage system, water supply line, strengthening of machine foundation, minor civil works inside the factory at ofaj.
Read morePercentage rate contract for inside factory at cfa
Percentage rate contract for inside factory at cfa
Read morePercentage rate contract for inside factory at cfa
Percentage rate contract for inside factory at cfa
Read morePercentage rate contract for inside factory at cfa
Percentage rate contract for inside factory at cfa
Read morePercentage rate contract for inside factory at cfa
Percentage rate contract for inside factory at cfa
Read moreof your Industry type