🛠️ Yantra India Limited Rfp For Factory Repairs And Renovations 🛠️ Yantra India Limited, A Public Sector Undertaking, Is Seeking Contractors For A Percentage Rate Contract To Undertake Repairs And Renovations Of Various Infrastructure Components Within The Ordnance Factory Ambajhari, Nagpur. 🏭 📅 Submission Deadline: May 14, 2024, 2:00 Pm The Scope Of Work Includes The Repair, Renovation, And Strengthening Of Existing Sheds, Floors, Cable Trenches, Covers, Drainage Systems, And Machine Foundations, Along With Minor Civil Works. Interested Contractors Must Submit An Earnest Money Deposit (Emd) Of Inr 30,000/ With Their Bids. Keywords: Yantra India Limited, Minor Civil Works, Factory Repairs, Renovation, Infrastructure, Psu, Rfp, Emd, Ordnance Factory Ambajhari, Nagpur
Particulars Details
Title
Percentage Rate Contract For Repairs, Renovation Of Existing Sheds, Floors, Cable Trenches And Covers, Drainage System, Strengthening Of Machine Foundation, Minor Civil Works Inside The Factory At Ofaj
Description
Percentage Rate Contract For Repairs, Renovation Of Existing Sheds, Floors, Cable Trenches And Covers, Drainage System, Strengthening Of Machine Foundation, Minor Civil Works Inside The Factory At Ofaj
Organisation Yantra India Limited | Public Sector Undertakings
Tender Id 2024_YIL_193956_1
Reference
Number
9905/06/RD2307/PRC/EOCivil/24
Tender Fee 0
EMD 30000
Tender Value -
Place Ordnance Factory Ambajhari, Nagpur
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=212363

Start Date April 23, 2024 18:00
End Date
Expired 14/05/2024

Expired 888 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Percentage rate contract for the electrical works inside the factory at ofd

Percentage rate contract for the electrical works inside the factory at ofd.

Read more
Percentage rate contract on mes ssr 2020 regarding repair and regular maintenance work in production building and its surrounding area inside factory at vfj

Percentage rate contract on mes ssr 2020 regarding repair and regular maintenance work in production building and its surrounding area inside factory at vfj

Read more
Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc

Surface excavation n exc not exceeding 30 cm deep and averaging 15cm deep and getting out,excavating in trenches n exc 1 5 m wide and n exc 1 5 m in depth for foundation etc or for shafts wells cesspits manholes pier holes etc n exc 10 sq m on plan and n exc 1 5 m in depth and getting out,providing and laying sand filling under floors or in foundations including watering and consolidation,providing and laying bricks sub class b laid flat in floors old size bricks,material and labour cement concrete in foundations filling and mass concrete type b2 1 2 4,material and labour boring holes 3 m deep in soil for under reamed piles and getting out and disposal of spoil to a distance of n exc 50 m,providing and laying rcc nominal mix in foundations including rafts footings foundation beams plinth beams bases for columns etc,providing and laying brickwork with subclass b bricks straight or curved on plan exc 6m mean radius built in cement mortar 1 4,providing and rendering 12mm thick on fair faces of brick work or conc

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Percentage rate contract for repairs, renovation of existing sheds, floors, cable trenches and covers, drainage system, water supply line, strengthening of machine foundation, minor civil works inside the factory at ofaj.

Percentage rate contract for repairs, renovation of existing sheds, floors, cable trenches and covers, drainage system, water supply line, strengthening of machine foundation, minor civil works inside the factory at ofaj.

Read more
Percentage rate contract for inside factory at cfa

Percentage rate contract for inside factory at cfa

Read more
Percentage rate contract for inside factory at cfa

Percentage rate contract for inside factory at cfa

Read more
Percentage rate contract for inside factory at cfa

Percentage rate contract for inside factory at cfa

Read more
Percentage rate contract for inside factory at cfa

Percentage rate contract for inside factory at cfa