Tender Details
Particulars | Details |
---|---|
Title |
Roof Support By Roof Bolting Along Traveling Roadways And Inspection Route Of Panel S12 A Top Sectionalisation Stopping In R Viii T2 Seam Of Shyamsundarpur Colliery.
|
Description |
Roof Support By Roof Bolting Along Traveling Roadways And Inspection Route Of Panel S12 A Top Sectionalisation Stopping In R Viii T2 Seam Of Shyamsundarpur Colliery.
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_ECL_322515_1 |
Reference Number |
ECL/GM/BA/E TENDER/24-25/Min/132 Dt 02.12.2024 |
Tender Fee | 0 |
EMD | 6000 |
Tender Value | |
Place | Shyamsundarpur Colliery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=334309 |
Start Date | December 02, 2024 23:30 |
End Date |
12/12/2024 ( Expired 163 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area
Construction of permanent support of pit no. 2 bottom travelling route to 6d with brick pillar and girder support in kenda bottom seam of kunustoria colliery under kunustoria area
Read moreSmart periodical repair/ replacement to roof sheet and roof treatment to certain bldgs in zone vii and viii of age b/r-ii under ge roorkee
Smart periodical repair/ replacement to roof sheet and roof treatment to certain bldgs in zone vii and viii of age b/r-ii under ge roorkee
Read moreConstruction of 05 (five) nos. sectionalization stopping to sectionalize the 08d/28l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Construction of 05 (five) nos. sectionalization stopping to sectionalize the 08d/28l dev. dist. in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreConstruction of foot steps along 28l drift (travelling road of 08d/28l dev. dist.) in kenda (r-vi) seam of bansra colliery under kunustoria area
Construction of foot steps along 28l drift (travelling road of 08d/28l dev. dist.) in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreConstruction of permanent support by constructing side support wall and brick pillar in between 8d-7d/31l-30l in kenda (r-vi) seam of bansra colliery under kunustoria area
Construction of permanent support by constructing side support wall and brick pillar in between 8d-7d/31l-30l in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreConstruction of 19 (nineteen) nos of sectionalisation stopping at b.p. top seam under kumardhubi colliery.
Construction of 19 (nineteen) nos of sectionalisation stopping at b.p. top seam under kumardhubi colliery.
Read moreRepairing of 10 (ten) nos. sectionalization stopping at d zone in kenda (r-vi) seam of bansra colliery under kunustoria area
Repairing of 10 (ten) nos. sectionalization stopping at d zone in kenda (r-vi) seam of bansra colliery under kunustoria area
Read moreRoof support by girders above brick wall at 0l/8d junction including 7-8dip and girder over brick wall with rcc slab in r-ixa seam at kalidaspur project
Roof support by girders above brick wall at 0l/8d junction including 7-8dip and girder over brick wall with rcc slab in r-ixa seam at kalidaspur project
Read moreSectionalisation of b17 panel of r-vi seam of khottadih colliery, pandaveswar area
Sectionalisation of b17 panel of r-vi seam of khottadih colliery, pandaveswar area
Read moreDrilling and grouting of roof bolts and jamming with resin capsule by using hydraulic roof (drill rod, drill bit and hy-draulic roof bolting machine provided by the contractor) bolting machine in lhd e9/e8 proposed depillaring panel of bagdona seam a
Drilling and grouting of roof bolts and jamming with resin capsule by using hydraulic roof (drill rod, drill bit and hy-draulic roof bolting machine provided by the contractor) bolting machine in lhd e9/e8 proposed depillaring panel of bagdona seam a
Read moreof your Industry type