Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🔧 Procurement Opportunity: Turbine Generator Rotor Stand 🔧 Brahmaputra Cracker And Polymer Limited, Under The Ministry Of Petroleum And Natural Gas, Is Seeking Bids For The Supply Of A Turbine Generator Rotor Stand. 📅 Bid Submission Deadline: April 03, 2024, 3:00 Pm Suppliers With Expertise In Heavy Machinery And Equipment Are Invited To Submit Detailed Bids, Including Technical Specifications, Pricing, And Delivery Schedules. Keywords: Turbine Generator Rotor Stand, Heavy Machinery, Equipment, Procurement, Brahmaputra Cracker And Polymer Limited, Ministry Of Petroleum And Natural Gas| Particulars | Details |
|---|---|
| Title |
Turbine Generator Rotor Stand
|
| Description |
|
| Organisation | Brahmaputra Cracker and Polymer Limited | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/4801770 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 19, 2024 22:57 |
| End Date |
Expired
03/04/2024
Expired 929 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
SARDAR KARNAIL SINGH & SONS
137970
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | GOURIKA INDIA LIMITED | Make : Gourika India Limited Model : GOURIKA INDIA LIMITED Title : TURBINE GENERATOR ROTOR STAND ( Q3) | 29-03-2024 16:39:50 | MSE | Qualified |
| 2 | SARDAR KARNAIL SINGH & SONS | Make : TURBINE GENERATOR ROTOR STAND ( Q3 ) Model : NA Title : TURBINE GENERATOR ROTOR STAND ( Q3) | 03-04-2024 14:40:39 | MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | SARDAR KARNAIL SINGH & SONS(MSE)( MSE Social Category:General ) | Item Categories : TURBINE GENERATOR ROTOR STAND | 137970.00 | L1 |
| 2 | GOURIKA INDIA LIMITED( MSE Social Category:General ) | Item Categories : TURBINE GENERATOR ROTOR STAND | 1500000.00 | L2 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| TURBINE GENERATOR ROTOR STAND ( Q3) | TURBINE GENERATOR ROTOR STAND ( Q3 ) | NA | 1 | ₹ 137970.000 |
Ma17st00t343109200-turbine rotor centring tool along with hex head stud
Ma17st00t343109200-turbine rotor centring tool along with hex head stud
Read moreAssembly of gas turbine rotor with the supply of consumables make
Assembly of gas turbine rotor with the supply of consumables makesiemens model v94.2 at ntpc dadri
Read moreWork of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Work of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Read moreReconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine of
Reconditioning refurbishment of rotor blade row1 of 13 d2 gas turbine ofntpc anta
Read moreRefurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Refurbishment and hsb of rgc turbine rotor of dhdt unit of mathura refinery
Read moreProcurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Procurement of hip turbine rotor with complete blade assembly with extension shaft for main turbine of unit5and6, 2x660 mw units of csctpp, chhabra
Read moreDesign and development of technology demonstrator of 25kw part electric gas turbine generator
Design and development of technology demonstrator of 25kw part electric gas turbine generator
Read moreRefurbishment of rotor by replacement of rotor rim sheets and re-stacking of 100mw unit-iii generator at kadamparai power house in kadamparai generation circle
Refurbishment of rotor by replacement of rotor rim sheets and re-stacking of 100mw unit-iii generator at kadamparai power house in kadamparai generation circle
Read moreTurbine flow meter,turbine flow meter,turbine flow meter
Turbine flow meter,turbine flow meter,turbine flow meter
Read moreSupply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Supply of double part endless wire rope sling as per specification attached,supply of sling with both end reeving, 6 x 37 fibre core construction as per specification attached,hp turbine turn buckle of min. 10 tonnes swl with both ends fork for turbine hp rotor as per specf,lp turbine turn buckle of min. 40 tonnes swl with both ends fork for turbine lp rotor as per specf
Read moreof your Industry type