Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Notice For External Cleaning Of Boiler Tubes In 15 Mw Co Generation Plant
|
| Description |
Notice For External Cleaning Of Boiler Tubes In 15 Mw Co Generation Plant
|
| Organisation | Department of Sugar | State Govt. and UT |
| Tender Id | 2024_TNCSF_458463_1 |
|
Reference Number |
1288/A4/2024/MRKCSM |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Sethiathope |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=545003 |
| Start Date | June 29, 2024 23:30 |
| End Date |
Expired
08/07/2024
Expired 833 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of boiler tubes for unit#5 overhauling,ktps
Procurement of boiler tubes for unit#5 overhauling,ktps
Read moreData analytics service (version 2) - metallurgical analysis of failed boiler tubes: buyer premise (on shore) service for rca of failed boiler tubes assisted bi
Data analytics service (version 2) - metallurgical analysis of failed boiler tubes: buyer premise (on shore) service for rca of failed boiler tubes assisted bi
Read moreSupply of boiler tube protection shielding for economiser zone in boiler of 2x660 mw, csctpp,chhabra
Supply of boiler tube protection shielding for economiser zone in boiler of 2x660 mw, csctpp,chhabra
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreImplementation automatic generation control on 4 gas turbine generators of 1500 mw pps iii bawana
As per tender documents
Read moreImplementation of transmission infrastructure to evacuate 3200 mw thermal power from upcoming generation station at chapar
Implementation of transmission infrastructure to evacuate 3200 mw thermal power from upcoming generation station at chapar
Read moreof your Industry type